Call 131546 and get a quote or book a New Home Inspection for Berremangra online today.
Jim’s Building Inspections conducts new home inspections (also known as new construction inspections) in Berremangra and the surrounding areas. Our expert consultants can assist you with every stage of your build and ensure your new build meets your expectations and the necessary standards.
Our local consultants have extensive experience and hold public liability and professional indemnity insurance—meaning you can have peace of mind when you acquire the services of a Jim’s Building Inspector.
We offer same day service for New Home Inspections in Berremangra and provide written reports via email within 24 hours of the inspection being conducted.
New Home Inspection Checklist
There are four key inspection stages which can be carried out for New Home Inspections:
Slab Stage
The slab stage or the base stage inspection is essential in the inspection process. Finished concrete is inspected to ensure there is an even and consistent finish. The surface should not be powdery or flakey. Levels are checked to confirm the slab has been installed within allowable deviation in the over level across and room or the entire build. The edge rebate is checked to ensure it is not “honeycombed” and there is no evidence of steel reinforcement protruding as it must have at least 40mm concrete coverage. The vapour barrier must extend past the poured concrete slab with adequate overlap left so that it extends up the side wall of the slab past the final finished ground level once the construction is completed.
Frame Stage
Frame stage inspections are conducted providing an independent assessment of the works to confirm they have been completed ready for stage payment. Internal checks and company appointed inspections are supported with a fresh and focussed and our review monitors the frame with respect to the approved construction methods stipulated in Australian Standard 1684.2 and the Engineers design requirements as detailed on the Approved Plans.
The installation of windows and door frames are checked at this stage. Frame positioning in relation to the supporting slab is checked with any overhanging tolerances along with load bearing timbers, lintels and orientation of Jack Studs above openings. Items such as the correct number of timber blocks and their securing method are checked along with all bracing, mechanical fasteners, tie downs and anchors.
Lockup
At this stage we inspect the roofing that is installed to ensure it is complete and free of defects and damage, all flashings are installed. A visual inspection is carried out to check the installation of Flashings. Brick work is checked for correct installation. All windows and doors are installed with the correct fixings using appropriate blocks and the frame straight, plumb and true.
The installed plaster to the ceilings, wall linings and fitted cornice is checked to ensure it is installed to acceptable standards. Waterproof membrane to showers & wet areas are inspected to ensure they are correctly installed and comply with the requirements of the Building Code.
Handover
Handover Inspections require an exhaustive check of the construction. At handover inspection we check that all the work completed “In a proper and workman like manner” ensuring that the workmanship is at an industry standard. The construction of the dwelling needs to reflect the Approved Plans and we check that all components of the building comply with relevant Australian Standards and Building Codes.
Handover or Final stage inspections are also called Practical Completion Inspections (PCI) and Pre Handover Inspections. Handover inspections are generally carried out on new homes when construction of the entire home has been completed and all internal fittings, fixtures and finishes have been installed and applied inside the home compliant with the relevant building plans and specifications.
To arrange a quote or a building inspection for a property in Berremangra, call Jim’s Building Inspections on 131546.
Or book your Berremangra New Home Inspection service online. Reports can be delivered within 24 hours of inspection.
Re-stumping red flags
A guide to Re-Stumping Re-stumping - or re-blocking as it's known in Victoria - is big business in Australia and can be a very costly exercise, particularly if you don't know what you're looking at and you don't understand what you've bought into....Read more
How do I go back to my home after Fire Damage?
A fire is a traumatic experience, and it can cause more damage than what you can see initially. Beyond the physical fire damage, you must also consider the smoke and soot contamination. Both can be dangerous and costly. Fire damage can extend to t...Read more
Blocked Guttering- One of the most Common Pre-Purchase Defects
Blocked gutters are one of the main defects found during a pre purchase inspection and is also one of the easiest to fix and prevent. Doing something as simple as keeping your gutters clean can save you thousands of dollars in maintenance costs in th...Read more
GET YOUR HOME READY FOR WINTER!
With winter only around 7 weeks away it is time to think about doing those essential jobs around the home that is really easy to forget. Then one day you look out the window and you have water cascading down your fascia and into your eaves. This happ...Read more
Timing of a building inspection
THE TIMING OF A BUILDING INSPECTION MOSTLY DEPENDS ON THE METHOD OF SALE. As the findings of a building inspection report may prompt you to withdraw an offer, you should always ensure that you are correctly informed of your rights and options. This ...Read more
Is your house cracking up?
Is your house cracking up? A long, spidery vein is inching its way across the dining room wall. It seems to be spreading even as you stare at it! You’re sure it wasn’t there yesterday! So what does this mean and how can it be fixed? Don’t...Read more
Do you think that property you are looking to buy has asbestos?
If the house you are looking to buy was built or renovated before 1990, it is likely that it will contain some form of asbestos-containing materials. Did you know that approximately one-third of homes built in Australia contain asbestos products? ...Read more
Inadequate Site and subfloor drainage
A sub-floor is the structure and crawl space between the lowest floor and the ground. High moisture levels in these areas promote fungal decay and other timber pests such as termites. All sub-floors and crawl spaces should be considered as having ...Read more
Building? Here Are Mark Campbell's Lessons Learned
“My rationale for building new was threefold,” writes Mark Campbell, a working-class Aussie. “Firstly, it enabled me to have control over the end product and it made sense from an investment perspective because I could maximise depreciation and...Read more
Mould - The Silent Killer
Mould: Ugly, yes. But the health consequences of inaction are uglier. Gizmodo explains: “A common mould called Aspergillus, when inhaled by particularly susceptible people, can infect the lungs and spread throughout the body. Other moulds that ...Read more