Call 131546 and get a quote or book a New Home Inspection for Gunalda online today.
Jim’s Building Inspections conducts new home inspections (also known as new construction inspections) in Gunalda and the surrounding areas. Our expert consultants can assist you with every stage of your build and ensure your new build meets your expectations and the necessary standards.
Our local consultants have extensive experience and hold public liability and professional indemnity insurance—meaning you can have peace of mind when you acquire the services of a Jim’s Building Inspector.
We offer same day service for New Home Inspections in Gunalda and provide written reports via email within 24 hours of the inspection being conducted.
New Home Inspection Checklist
There are four key inspection stages which can be carried out for New Home Inspections:
Slab Stage
The slab stage or the base stage inspection is essential in the inspection process. Finished concrete is inspected to ensure there is an even and consistent finish. The surface should not be powdery or flakey. Levels are checked to confirm the slab has been installed within allowable deviation in the over level across and room or the entire build. The edge rebate is checked to ensure it is not “honeycombed” and there is no evidence of steel reinforcement protruding as it must have at least 40mm concrete coverage. The vapour barrier must extend past the poured concrete slab with adequate overlap left so that it extends up the side wall of the slab past the final finished ground level once the construction is completed.
Frame Stage
Frame stage inspections are conducted providing an independent assessment of the works to confirm they have been completed ready for stage payment. Internal checks and company appointed inspections are supported with a fresh and focussed and our review monitors the frame with respect to the approved construction methods stipulated in Australian Standard 1684.2 and the Engineers design requirements as detailed on the Approved Plans.
The installation of windows and door frames are checked at this stage. Frame positioning in relation to the supporting slab is checked with any overhanging tolerances along with load bearing timbers, lintels and orientation of Jack Studs above openings. Items such as the correct number of timber blocks and their securing method are checked along with all bracing, mechanical fasteners, tie downs and anchors.
Lockup
At this stage we inspect the roofing that is installed to ensure it is complete and free of defects and damage, all flashings are installed. A visual inspection is carried out to check the installation of Flashings. Brick work is checked for correct installation. All windows and doors are installed with the correct fixings using appropriate blocks and the frame straight, plumb and true.
The installed plaster to the ceilings, wall linings and fitted cornice is checked to ensure it is installed to acceptable standards. Waterproof membrane to showers & wet areas are inspected to ensure they are correctly installed and comply with the requirements of the Building Code.
Handover
Handover Inspections require an exhaustive check of the construction. At handover inspection we check that all the work completed “In a proper and workman like manner” ensuring that the workmanship is at an industry standard. The construction of the dwelling needs to reflect the Approved Plans and we check that all components of the building comply with relevant Australian Standards and Building Codes.
Handover or Final stage inspections are also called Practical Completion Inspections (PCI) and Pre Handover Inspections. Handover inspections are generally carried out on new homes when construction of the entire home has been completed and all internal fittings, fixtures and finishes have been installed and applied inside the home compliant with the relevant building plans and specifications.
To arrange a quote or a building inspection for a property in Gunalda, call Jim’s Building Inspections on 131546.
Or book your Gunalda New Home Inspection service online. Reports can be delivered within 24 hours of inspection.
Passing Your Next Rental Inspection With Mould-Busting Professionals
What’s one thing landlords despise? If you guessed mould, you’re right. “The obvious things we look for are mould in the bathrooms/cupboards/bedrooms,” says one expert in the field. “This is usually an indication that the tenant isn’t ...Read more
Building Inspection Reports - the ultimate negotiation weapon
Rising damp and termite damage. Two issues that would normally send shivers down your spine and see potential buyers running for the hills. But what if you could you turn a negative building inspection report, into the ultimate negotiation weapon?...Read more
Why arranging a Pre-Sale inspection can give you an advantage
If you’re thinking about listing your home for sale, it is the perfect time to look at anything you may need to fix or repair. You’re probably used to the ceiling water stains and spots of mould in your kitchen cupboards, but these minor defects ...Read more
The Dirty World Of Termites
This summer it’s time to think pests. "Generally the soil moisture is high, that makes a big difference to termites. Termites are really just organised cockroaches," says Dr Ewart to The Age in an article titled: Hungry termites marching on Melbour...Read more
Go With Licensed Pre-Property Inspectors
What makes a good pre-property inspector? Sourceable’s Howard Ryan writes: ‘To do the job properly, a qualified building inspector will have extensive knowledge of the Building Code of Australia, the Building Act, the Building Regulations and var...Read more
New homes & Termite zones
An increasing number of councils across Australia are seeing the value in designating residential zones as termite prone areas in an effort to help local communities avoid costly repairs and horror surprises in the future. Victoria is the only Aus...Read more
What Does Jim Know About Building Inspections Anyway?
ACTUALLY, QUITE A BIT MORE THAN WE EVER REALISED! We recently discovered that Jim Penman’s dad was a forensic engineer. From an early age Jim’s father was investigating materials, structures and their components which failed o...Read more
Inadequate Site and subfloor drainage
A sub-floor is the structure and crawl space between the lowest floor and the ground. High moisture levels in these areas promote fungal decay and other timber pests such as termites. All sub-floors and crawl spaces should be considered as having ...Read more
Blacklists For Potential Tenants? You Betcha!
Yes. Blacklisting tenants is a thing and may not be talked about because of shame-related issues. According to the ABC, a person can be blacklisted without even being aware. His or her name in such a case will pop up on tenancy databases meanin...Read more
Tips For First Home Buyers.
With government policy and a market that has cooled in recent times, the opportunities for first home buyers is really exciting. The dream of buying your first home is becoming a reality. There are however so many factors to look out for before you r...Read more