Call 131546 and get a quote or book a New Home Inspection for Judds Creek online today.
Jim’s Building Inspections conducts new home inspections (also known as new construction inspections) in Judds Creek and the surrounding areas. Our expert consultants can assist you with every stage of your build and ensure your new build meets your expectations and the necessary standards.
Our local consultants have extensive experience and hold public liability and professional indemnity insurance—meaning you can have peace of mind when you acquire the services of a Jim’s Building Inspector.
We offer same day service for New Home Inspections in Judds Creek and provide written reports via email within 24 hours of the inspection being conducted.
New Home Inspection Checklist
There are four key inspection stages which can be carried out for New Home Inspections:
Slab Stage
The slab stage or the base stage inspection is essential in the inspection process. Finished concrete is inspected to ensure there is an even and consistent finish. The surface should not be powdery or flakey. Levels are checked to confirm the slab has been installed within allowable deviation in the over level across and room or the entire build. The edge rebate is checked to ensure it is not “honeycombed” and there is no evidence of steel reinforcement protruding as it must have at least 40mm concrete coverage. The vapour barrier must extend past the poured concrete slab with adequate overlap left so that it extends up the side wall of the slab past the final finished ground level once the construction is completed.
Frame Stage
Frame stage inspections are conducted providing an independent assessment of the works to confirm they have been completed ready for stage payment. Internal checks and company appointed inspections are supported with a fresh and focussed and our review monitors the frame with respect to the approved construction methods stipulated in Australian Standard 1684.2 and the Engineers design requirements as detailed on the Approved Plans.
The installation of windows and door frames are checked at this stage. Frame positioning in relation to the supporting slab is checked with any overhanging tolerances along with load bearing timbers, lintels and orientation of Jack Studs above openings. Items such as the correct number of timber blocks and their securing method are checked along with all bracing, mechanical fasteners, tie downs and anchors.
Lockup
At this stage we inspect the roofing that is installed to ensure it is complete and free of defects and damage, all flashings are installed. A visual inspection is carried out to check the installation of Flashings. Brick work is checked for correct installation. All windows and doors are installed with the correct fixings using appropriate blocks and the frame straight, plumb and true.
The installed plaster to the ceilings, wall linings and fitted cornice is checked to ensure it is installed to acceptable standards. Waterproof membrane to showers & wet areas are inspected to ensure they are correctly installed and comply with the requirements of the Building Code.
Handover
Handover Inspections require an exhaustive check of the construction. At handover inspection we check that all the work completed “In a proper and workman like manner” ensuring that the workmanship is at an industry standard. The construction of the dwelling needs to reflect the Approved Plans and we check that all components of the building comply with relevant Australian Standards and Building Codes.
Handover or Final stage inspections are also called Practical Completion Inspections (PCI) and Pre Handover Inspections. Handover inspections are generally carried out on new homes when construction of the entire home has been completed and all internal fittings, fixtures and finishes have been installed and applied inside the home compliant with the relevant building plans and specifications.
To arrange a quote or a building inspection for a property in Judds Creek, call Jim’s Building Inspections on 131546.
Or book your Judds Creek New Home Inspection service online. Reports can be delivered within 24 hours of inspection.
To Buy Or Not To Buy (Off The Plan)
To buy or not to buy (off the plan) is an important issue for an increasing number of new homebuyers and property investors. When done responsibly with professional guidance (offered by Jim’s Building Inspections, for example) it can be a positi...Read more
Inadequate Site and subfloor drainage
A sub-floor is the structure and crawl space between the lowest floor and the ground. High moisture levels in these areas promote fungal decay and other timber pests such as termites. All sub-floors and crawl spaces should be considered as having ...Read more
Need To Know - Building Inspection Inclusions and Exclusions
It is important to understand what is generally included and excluded in a building inspection service. Jim's Building Inspections work hard to understand what type of property you are purchasing. Factors that influence which building inspection...Read more
What is Caveat Emptor?
Increasingly property buyers are aware of their responsibility to discover building defects before sale – this is known as the Latin principle Caveat Emptor or ‘buyer beware’. The full quotation is ‘caveat emptor, qui ignorare no...Read more
What does Domestic Building Insurance means to Builder or an Owner Builder in Victoria.
Whether you are a homeowner who is using a Builder or an Owner Builder, it is mandatory to get a domestic building insurance. If you undertake domestic building work worth more than $16,000, then you need domestic building insurance. Furthermore,...Read more
How is a House Inspection Organised?
Whilst it’s up to you, the majority of our clients simply provide the Real Estate Agents details and then we will then contact them to organise the date and time of the house inspection. Generally this saves you a few more phone calls and emails...Read more
Blocked Guttering- One of the most Common Pre-Purchase Defects
Blocked gutters are one of the main defects found during a pre purchase inspection and is also one of the easiest to fix and prevent. Doing something as simple as keeping your gutters clean can save you thousands of dollars in maintenance costs in th...Read more
WHAT’S THE MOST COMMON BUILDING INSPECTIONS SIGNIFICANT DEFECT?
Over the past two years, the most common Significant defect found, is the damp shower. Modern showers are aesthetically pleasing and appear to be installed to the highest standard. However, countless showers have been found this year to have damp cor...Read more
Timing of a building inspection
THE TIMING OF A BUILDING INSPECTION MOSTLY DEPENDS ON THE METHOD OF SALE. As the findings of a building inspection report may prompt you to withdraw an offer, you should always ensure that you are correctly informed of your rights and options. This ...Read more
Jim's Building Inspections hits 100 Franchisees!
Jim's Building Inspections is pleased to announce that September 2017 saw its 100th Franchisee sign on to Jim's Building Inspections, officially launching the division as one of the biggest building inspection companies in Australia. Director Paul...Read more