Call 131546 and get a quote or book a New Home Inspection for Stockrington online today.

Jim’s Building Inspections conducts new home inspections (also known as new construction inspections) in Stockrington and the surrounding areas. Our expert consultants can assist you with every stage of your build and ensure your new build meets your expectations and the necessary standards.

Our local consultants have extensive experience and hold public liability and professional indemnity insurance—meaning you can have peace of mind when you acquire the services of a Jim’s Building Inspector.

We offer same day service for New Home Inspections in Stockrington and provide written reports via email within 24 hours of the inspection being conducted.

 

New Home Inspection Checklist

There are four key inspection stages which can be carried out for New Home Inspections:


Slab Stage

The slab stage or the base stage inspection is essential in the inspection process. Finished concrete is inspected to ensure there is an even and consistent finish. The surface should not be powdery or flakey. Levels are checked to confirm the slab has been installed within allowable deviation in the over level across and room or the entire build. The edge rebate is checked to ensure it is not “honeycombed” and there is no evidence of steel reinforcement protruding as it must have at least 40mm concrete coverage. The vapour barrier must extend past the poured concrete slab with adequate overlap left so that it extends up the side wall of the slab past the final finished ground level once the construction is completed.

 

Frame Stage

Frame stage inspections are conducted providing an independent assessment of the works to confirm they have been completed ready for stage payment. Internal checks and company appointed inspections are supported with a fresh and focussed and our review monitors the frame with respect to the approved construction methods stipulated in Australian Standard 1684.2 and the Engineers design requirements as detailed on the Approved Plans.

The installation of windows and door frames are checked at this stage. Frame positioning in relation to the supporting slab is checked with any overhanging tolerances along with load bearing timbers, lintels and orientation of Jack Studs above openings. Items such as the correct number of timber blocks and their securing method are checked along with all bracing, mechanical fasteners, tie downs and anchors.

 

Lockup

At this stage we inspect the roofing that is installed to ensure it is complete and free of defects and damage, all flashings are installed. A visual inspection is carried out to check the installation of Flashings. Brick work is checked for correct installation. All windows and doors are installed with the correct fixings using appropriate blocks and the frame straight, plumb and true.

The installed plaster to the ceilings, wall linings and fitted cornice is checked to ensure it is installed to acceptable standards. Waterproof membrane to showers & wet areas are inspected to ensure they are correctly installed and comply with the requirements of the Building Code.

 

Handover

Handover Inspections require an exhaustive check of the construction. At handover inspection we check that all the work completed “In a proper and workman like manner” ensuring that the workmanship is at an industry standard. The construction of the dwelling needs to reflect the Approved Plans and we check that all components of the building comply with relevant Australian Standards and Building Codes.

Handover or Final stage inspections are also called Practical Completion Inspections (PCI) and Pre Handover Inspections. Handover inspections are generally carried out on new homes when construction of the entire home has been completed and all internal fittings, fixtures and finishes have been installed and applied inside the home compliant with the relevant building plans and specifications.

 

To arrange a quote or a building inspection for a property in Stockrington, call Jim’s Building Inspections on 131546.
Or book your Stockrington New Home Inspection service online. Reports can be delivered within 24 hours of inspection.

You could be unknowingly welcoming Termites into your home?

Termites are among homeowners’ worst nightmares. They aren’t just nasty little pests that make your home dirty – they can tear through your home’s materials, damaging your property and making your home less safe for your family and guests. Ta...
Read more

Your Health Health Before Mould

Imagine if you were battling the following: Nose bleeds, chest infections, sinus troubles, asthma, hair loss, breathing issues, chronic fatigue, rashes and headaches. Sad to say, but these are just some of the potential consequences of living with...
Read more

What Does Jim Know About Building Inspections Anyway?

ACTUALLY, QUITE A BIT MORE THAN WE EVER REALISED! We recently discovered that Jim Penman’s dad was a forensic engineer. From an early age Jim’s father was investigating materials, structures and their components which failed o...
Read more

Proposed New Tax To Help Home Owners Remove Asbestos

Did you know that 1 in 3 Australian homes contain asbestos? With home renovations on the rise, many Australian's are purchasing homes built before 1985 with the intention of doing small renos through to complete rebuilds. Unfortunately, many people a...
Read more

Why arranging a Pre-Sale inspection can give you an advantage

If you’re thinking about listing your home for sale, it is the perfect time to look at anything you may need to fix or repair. You’re probably used to the ceiling water stains and spots of mould in your kitchen cupboards, but these minor defects ...
Read more

Is your house cracking up?

Is your house cracking up? A long, spidery vein is inching its way across the dining room wall. It seems to be spreading even as you stare at it! You’re sure it wasn’t there yesterday! So what does this mean and how can it be fixed? Don’t...
Read more

Beating the Dangerous World of Mould - Related Illnesses

Moving to a share house is an exciting adventure for young adults. At least, that’s the theory. So when healthy Tim Kirby started losing weight, developing insomnia, experiencing frequent headaches and battling fatigue, he was in search of answers....
Read more

Timing of a building inspection

THE TIMING OF A BUILDING INSPECTION MOSTLY DEPENDS ON THE METHOD OF SALE. As the findings of a building inspection report may prompt you to withdraw an offer, you should always ensure that you are correctly informed of your rights and options. This ...
Read more

The Science Of Inspections

There’s a science to property inspections. Seriously. Because while your average inspector can and does spot problems, a trained inspector can find problems behind problems and other easy-to-miss issues. What’s more, he or she is less likely t...
Read more

Inadequate Site and subfloor drainage

A sub-floor is the structure and crawl space between the lowest floor and the ground. High moisture levels in these areas promote fungal decay and other timber pests such as termites. All sub-floors and crawl spaces should be considered as having ...
Read more


In Stockrington

nsw Suburbs Index

New Home Inspections suburbs in hunter-valley region