Call 131 546 and get a quote or book a New Home Inspection for Balranald online today.
Jim’s Building Inspections conducts new home inspections (also known as new construction inspections) in Balranald and the surrounding areas. Our expert consultants can assist you with every stage of your build and ensure your new build meets your expectations and the necessary standards.
Our local consultants have extensive experience and hold public liability and professional indemnity insurance—meaning you can have peace of mind when you acquire the services of a Jim’s Building Inspector.
We offer same day service for New Home Inspections in Balranald and provide written reports via email within 24 hours of the inspection being conducted.
New Home Inspection Checklist
There are four key inspection stages which can be carried out for New Home Inspections:
1. Slab Stage
The slab stage or the base stage inspection is essential in the inspection process. Finished concrete is inspected to ensure there is an even and consistent finish. The surface should not be powdery or flakey. Levels are checked to confirm the slab has been installed within allowable deviation in the over level across and room or the entire build. The edge rebate is checked to ensure it is not “honeycombed” and there is no evidence of steel reinforcement protruding as it must have at least 40mm concrete coverage. The vapour barrier must extend past the poured concrete slab with adequate overlap left so that it extends up the side wall of the slab past the final finished ground level once the construction is completed.
2. Frame Stage
Frame stage inspections are conducted providing an independent assessment of the works to confirm they have been completed ready for stage payment. Internal checks and company appointed inspections are supported with a fresh and focussed and our review monitors the frame with respect to the approved construction methods stipulated in Australian Standard 1684.2 and the Engineers design requirements as detailed on the Approved Plans.
The installation of windows and door frames are checked at this stage. Frame positioning in relation to the supporting slab is checked with any overhanging tolerances along with load bearing timbers, lintels and orientation of Jack Studs above openings. Items such as the correct number of timber blocks and their securing method are checked along with all bracing, mechanical fasteners, tie downs and anchors.
3. Lockup
At this stage we inspect the roofing that is installed to ensure it is complete and free of defects and damage, all flashings are installed. A visual inspection is carried out to check the installation of Flashings. Brick work is checked for correct installation. All windows and doors are installed with the correct fixings using appropriate blocks and the frame straight, plumb and true.
The installed plaster to the ceilings, wall linings and fitted cornice is checked to ensure it is installed to acceptable standards. Waterproof membrane to showers & wet areas are inspected to ensure they are correctly installed and comply with the requirements of the Building Code.
4. Handover
Handover Inspections require an exhaustive check of the construction. At handover inspection we check that all the work completed “In a proper and workman like manner” ensuring that the workmanship is at an industry standard. The construction of the dwelling needs to reflect the Approved Plans and we check that all components of the building comply with relevant Australian Standards and Building Codes.
Handover or Final stage inspections are also called Practical Completion Inspections (PCI) and Pre Handover Inspections. Handover inspections are generally carried out on new homes when construction of the entire home has been completed and all internal fittings, fixtures and finishes have been installed and applied inside the home compliant with the relevant building plans and specifications.
To arrange a quote or a building inspection for a property in Balranald, call Jim’s Building Inspections on 131 546.
Or book your Balranald New Home Inspection service online. Reports can be delivered within 24 hours of inspection.
Timing of a building inspection
THE TIMING OF A BUILDING INSPECTION MOSTLY DEPENDS ON THE METHOD OF SALE. As the findings of a building inspection report may prompt you to withdraw an offer, you should always ensure that you are correctly informed of your rights and options. This ...Read more
Proposed New Tax To Help Home Owners Remove Asbestos
Did you know that 1 in 3 Australian homes contain asbestos? With home renovations on the rise, many Australian's are purchasing homes built before 1985 with the intention of doing small renos through to complete rebuilds. Unfortunately, many people a...Read more
What is Caveat Emptor?
Increasingly property buyers are aware of their responsibility to discover building defects before sale – this is known as the Latin principle Caveat Emptor or ‘buyer beware’. The full quotation is ‘caveat emptor, qui ignorare no...Read more
To Buy Or Not To Buy (Off The Plan)
To buy or not to buy (off the plan) is an important issue for an increasing number of new homebuyers and property investors. When done responsibly with professional guidance (offered by Jim’s Building Inspections, for example) it can be a positi...Read more
WHAT’S THE MOST COMMON BUILDING INSPECTIONS SIGNIFICANT DEFECT?
Over the past two years, the most common Significant defect found, is the damp shower. Modern showers are aesthetically pleasing and appear to be installed to the highest standard. However, countless showers have been found this year to have damp cor...Read more
The Case For More Home Inspections
Building surveyors are calling on Victoria’s state government to mandate balcony inspections. This follows the tragic balcony collapse in Doncaster East in late 2017. Sadly, two people died and many others were injured, according to The Age. In ...Read more
EXPLAINED – Owner Builder Warranty Inspections & S137B of the Victoria Building Act 1993
You're an owner builder and it is time to sell your home. The last thing you want is for your hard work to be a hindrance to potential purchasers who have reservations about quality or compliance, just because the works weren't part of a major domest...Read more
How Jim's Building Inspections Became Australia's Number One Choice
Jim’s Building Inspections has grown to become Australia’s largest building inspection business in just three years. How did we do that? It was actually pretty easy, which is probably a damning commentary on the state of the industry! The ...Read more
Asbestos Concerns? Call The Experts
Here’s an all too familiar story from the Newcastle Herald: A Glendale property is demolished after its owners found deadly loose-fill asbestos insulation. This type of asbestos was relatively popular in the1960s and 1970s. Science now tells ...Read more
Tips For First Home Buyers.
With government policy and a market that has cooled in recent times, the opportunities for first home buyers is really exciting. The dream of buying your first home is becoming a reality. There are however so many factors to look out for before you r...Read more