Building and Pest inspector standing in front of Jims Building Inspections car

Call 131 546 and get a quote or book a New Home Inspection for Red Hill online today.

Jim’s Building Inspections conducts new home inspections (also known as new construction inspections) in Red Hill and the surrounding areas. Our expert consultants can assist you with every stage of your build and ensure your new build meets your expectations and the necessary standards.

Our local consultants have extensive experience and hold public liability and professional indemnity insurance—meaning you can have peace of mind when you acquire the services of a Jim’s Building Inspector.

We offer same day service for New Home Inspections in Red Hill and provide written reports via email within 24 hours of the inspection being conducted.

New Home Inspection Checklist

There are four key inspection stages which can be carried out for New Home Inspections:

1. Slab Stage

The slab stage or the base stage inspection is essential in the inspection process. Finished concrete is inspected to ensure there is an even and consistent finish. The surface should not be powdery or flakey. Levels are checked to confirm the slab has been installed within allowable deviation in the over level across and room or the entire build. The edge rebate is checked to ensure it is not “honeycombed” and there is no evidence of steel reinforcement protruding as it must have at least 40mm concrete coverage. The vapour barrier must extend past the poured concrete slab with adequate overlap left so that it extends up the side wall of the slab past the final finished ground level once the construction is completed.

2. Frame Stage

Frame stage inspections are conducted providing an independent assessment of the works to confirm they have been completed ready for stage payment. Internal checks and company appointed inspections are supported with a fresh and focussed and our review monitors the frame with respect to the approved construction methods stipulated in Australian Standard 1684.2 and the Engineers design requirements as detailed on the Approved Plans.

The installation of windows and door frames are checked at this stage. Frame positioning in relation to the supporting slab is checked with any overhanging tolerances along with load bearing timbers, lintels and orientation of Jack Studs above openings. Items such as the correct number of timber blocks and their securing method are checked along with all bracing, mechanical fasteners, tie downs and anchors.

3. Lockup

At this stage we inspect the roofing that is installed to ensure it is complete and free of defects and damage, all flashings are installed. A visual inspection is carried out to check the installation of Flashings. Brick work is checked for correct installation. All windows and doors are installed with the correct fixings using appropriate blocks and the frame straight, plumb and true.

The installed plaster to the ceilings, wall linings and fitted cornice is checked to ensure it is installed to acceptable standards. Waterproof membrane to showers & wet areas are inspected to ensure they are correctly installed and comply with the requirements of the Building Code.

4. Handover

Handover Inspections require an exhaustive check of the construction. At handover inspection we check that all the work completed “In a proper and workman like manner” ensuring that the workmanship is at an industry standard. The construction of the dwelling needs to reflect the Approved Plans and we check that all components of the building comply with relevant Australian Standards and Building Codes.

Handover or Final stage inspections are also called Practical Completion Inspections (PCI) and Pre Handover Inspections. Handover inspections are generally carried out on new homes when construction of the entire home has been completed and all internal fittings, fixtures and finishes have been installed and applied inside the home compliant with the relevant building plans and specifications.

To arrange a quote or a building inspection for a property in Red Hill, call Jim’s Building Inspections on 131 546.

Or book your Red Hill New Home Inspection service online. Reports can be delivered within 24 hours of inspection.

Inadequate Site and subfloor drainage

A sub-floor is the structure and crawl space between the lowest floor and the ground. High moisture levels in these areas promote fungal decay and other timber pests such as termites. All sub-floors and crawl spaces should be considered as having ...
Read more

Three Simple Ways To Fight Mould

Some things are out of our control. Others are in our control. Thus, when speaking about mould, there are many things we can do. One: Root causes. Find them. A good place to start: Jim’s Building Inspections. When mould is found by experts it’...
Read more

How is a House Inspection Organised?

Whilst it’s up to you, the majority of our clients simply provide the Real Estate Agents details and then we will then contact them to organise the date and time of the house inspection. Generally this saves you a few more phone calls and emails...
Read more

Property Styling - the Melbourne stats

Property Styling, Melbourne, works. If you were considering property styling in Melbourne as part of your sale campaign, you can now rest easy knowing that every dollar invested in property styling is likely to return over $1900 to your back pocket ...
Read more

Blocked Guttering- One of the most Common Pre-Purchase Defects

Blocked gutters are one of the main defects found during a pre purchase inspection and is also one of the easiest to fix and prevent. Doing something as simple as keeping your gutters clean can save you thousands of dollars in maintenance costs in th...
Read more

A Good Building Inspection Is Better Than An Expensive Cure

Put yourself in Hao’s shoes. He buys his dream home only to discover a buyer’s worst nightmare: most of his buildings are illegal. As the Whittlesea Council says: His bungalow was constructed without a permit. And to add insult to financial in...
Read more

10 Horrifying Traps a (Good) House Inspector Might Find

Number One: Asbestos. Enough said. Number Two: Termites. In a word: EVIL. Number Three: Fire hazards. Wouldn’t wish this upon my worst enemy. Number Four: Faulty smoke alarms. It’s a thing. Number Five: Ghosts. Okay, kidding. Okay, ma...
Read more

GET YOUR HOME READY FOR WINTER!

With winter only around 7 weeks away it is time to think about doing those essential jobs around the home that is really easy to forget. Then one day you look out the window and you have water cascading down your fascia and into your eaves. This happ...
Read more

To Buy Or Not To Buy (Off The Plan)

To buy or not to buy (off the plan) is an important issue for an increasing number of new homebuyers and property investors. When done responsibly with professional guidance (offered by Jim’s Building Inspections, for example) it can be a positi...
Read more

How To Avoid Renovation Traps

Renovations done right can pay off. Literally. That said there are some serious traps to avoid. Potential problems from wiring to asbestos issues often come up especially in older houses, so it’s important to seek professional help. Jim’s Buil...
Read more


In Red Hill

nsw Suburbs Index

New Home Inspections suburbs in north-coast region