Call 131 546 and get a quote or book a New Home Inspection for Meringa online today.
Jim’s Building Inspections conducts new home inspections (also known as new construction inspections) in Meringa and the surrounding areas. Our expert consultants can assist you with every stage of your build and ensure your new build meets your expectations and the necessary standards.
Our local consultants have extensive experience and hold public liability and professional indemnity insurance—meaning you can have peace of mind when you acquire the services of a Jim’s Building Inspector.
We offer same day service for New Home Inspections in Meringa and provide written reports via email within 24 hours of the inspection being conducted.
New Home Inspection Checklist
There are four key inspection stages which can be carried out for New Home Inspections:
1. Slab Stage
The slab stage or the base stage inspection is essential in the inspection process. Finished concrete is inspected to ensure there is an even and consistent finish. The surface should not be powdery or flakey. Levels are checked to confirm the slab has been installed within allowable deviation in the over level across and room or the entire build. The edge rebate is checked to ensure it is not “honeycombed” and there is no evidence of steel reinforcement protruding as it must have at least 40mm concrete coverage. The vapour barrier must extend past the poured concrete slab with adequate overlap left so that it extends up the side wall of the slab past the final finished ground level once the construction is completed.
2. Frame Stage
Frame stage inspections are conducted providing an independent assessment of the works to confirm they have been completed ready for stage payment. Internal checks and company appointed inspections are supported with a fresh and focussed and our review monitors the frame with respect to the approved construction methods stipulated in Australian Standard 1684.2 and the Engineers design requirements as detailed on the Approved Plans.
The installation of windows and door frames are checked at this stage. Frame positioning in relation to the supporting slab is checked with any overhanging tolerances along with load bearing timbers, lintels and orientation of Jack Studs above openings. Items such as the correct number of timber blocks and their securing method are checked along with all bracing, mechanical fasteners, tie downs and anchors.
3. Lockup
At this stage we inspect the roofing that is installed to ensure it is complete and free of defects and damage, all flashings are installed. A visual inspection is carried out to check the installation of Flashings. Brick work is checked for correct installation. All windows and doors are installed with the correct fixings using appropriate blocks and the frame straight, plumb and true.
The installed plaster to the ceilings, wall linings and fitted cornice is checked to ensure it is installed to acceptable standards. Waterproof membrane to showers & wet areas are inspected to ensure they are correctly installed and comply with the requirements of the Building Code.
4. Handover
Handover Inspections require an exhaustive check of the construction. At handover inspection we check that all the work completed “In a proper and workman like manner” ensuring that the workmanship is at an industry standard. The construction of the dwelling needs to reflect the Approved Plans and we check that all components of the building comply with relevant Australian Standards and Building Codes.
Handover or Final stage inspections are also called Practical Completion Inspections (PCI) and Pre Handover Inspections. Handover inspections are generally carried out on new homes when construction of the entire home has been completed and all internal fittings, fixtures and finishes have been installed and applied inside the home compliant with the relevant building plans and specifications.
To arrange a quote or a building inspection for a property in Meringa, call Jim’s Building Inspections on 131 546.
Or book your Meringa New Home Inspection service online. Reports can be delivered within 24 hours of inspection.
Meth testing - the new norm for prudent home buyers
The New Norm? Including Meth checks in Pre-Purchase Building Inspections For home buyers there is nothing unusual about organising a Pre-Purchase Building Inspection on a potential property purchase. For smart buyers, a Pre-Purchase Building Inspe...Read more
Why arranging a Pre-Sale inspection can give you an advantage
If you’re thinking about listing your home for sale, it is the perfect time to look at anything you may need to fix or repair. You’re probably used to the ceiling water stains and spots of mould in your kitchen cupboards, but these minor defects ...Read more
Timing of a building inspection
THE TIMING OF A BUILDING INSPECTION MOSTLY DEPENDS ON THE METHOD OF SALE. As the findings of a building inspection report may prompt you to withdraw an offer, you should always ensure that you are correctly informed of your rights and options. This ...Read more
Due Diligence for Home Buyers
Literal meaning of Due diligence is doing a comprehensive appraisal of any buying task undertaken by a prospective buyer, especially to establish its assets and liabilities and evaluate its potential. It is utmost important to do your due diligenc...Read more
Who Needs a Building Inspection?
Building Inspections are generally ordered in the process of buying or selling a home. A building inspection may also be required if you discover that your home has developed a building defect over time or in response to an incident or accident. ...Read more
Asbestos - Not Just About Housing
FEATHERS were flying in Red Hill last week when neighbours discovered asbestos sheeting was being removed from a disused chicken shed near their properties. First reported in the Southern Peninsula News (6 November 2018) the story continues: Mo...Read more
Jim's Building Inspections hits 100 Franchisees!
Jim's Building Inspections is pleased to announce that September 2017 saw its 100th Franchisee sign on to Jim's Building Inspections, officially launching the division as one of the biggest building inspection companies in Australia. Director Paul...Read more
How Different Methods of Property Sale Impact When You Need a Building Inspection
THE TIMING OF A BUILDING INSPECTION DEPENDS ON YOUR SITUATION AND MOSTLY THE METHOD OF SALE. As the findings of a building inspection report may cause you to withdraw an offer you should always ensure that you are informed of your ri...Read more
Mouldy Issues For Landlords
A growing number of tenants are trying to educate landlords about the many ways in which mould can make us sick. So the ABC’s AM political reporter, Alexandra Beech, took the time to speak to one such person, Caleb Rudd. Mr Rudd is behind a Face...Read more
Rental Reforms To Hit Queensland
Queensland’s 40-year-old rental laws are under scrutiny. One big potential change: making it easier for tenants to own pets and more pressure to address repairs in a timely manner. Property owners, however, may have more powers in their hands to ch...Read more