Call 131 546 and get a quote or book a New Home Inspection for Nara online today.
Jim’s Building Inspections conducts new home inspections (also known as new construction inspections) in Nara and the surrounding areas. Our expert consultants can assist you with every stage of your build and ensure your new build meets your expectations and the necessary standards.
Our local consultants have extensive experience and hold public liability and professional indemnity insurance—meaning you can have peace of mind when you acquire the services of a Jim’s Building Inspector.
We offer same day service for New Home Inspections in Nara and provide written reports via email within 24 hours of the inspection being conducted.
New Home Inspection Checklist
There are four key inspection stages which can be carried out for New Home Inspections:
1. Slab Stage
The slab stage or the base stage inspection is essential in the inspection process. Finished concrete is inspected to ensure there is an even and consistent finish. The surface should not be powdery or flakey. Levels are checked to confirm the slab has been installed within allowable deviation in the over level across and room or the entire build. The edge rebate is checked to ensure it is not “honeycombed” and there is no evidence of steel reinforcement protruding as it must have at least 40mm concrete coverage. The vapour barrier must extend past the poured concrete slab with adequate overlap left so that it extends up the side wall of the slab past the final finished ground level once the construction is completed.
2. Frame Stage
Frame stage inspections are conducted providing an independent assessment of the works to confirm they have been completed ready for stage payment. Internal checks and company appointed inspections are supported with a fresh and focussed and our review monitors the frame with respect to the approved construction methods stipulated in Australian Standard 1684.2 and the Engineers design requirements as detailed on the Approved Plans.
The installation of windows and door frames are checked at this stage. Frame positioning in relation to the supporting slab is checked with any overhanging tolerances along with load bearing timbers, lintels and orientation of Jack Studs above openings. Items such as the correct number of timber blocks and their securing method are checked along with all bracing, mechanical fasteners, tie downs and anchors.
3. Lockup
At this stage we inspect the roofing that is installed to ensure it is complete and free of defects and damage, all flashings are installed. A visual inspection is carried out to check the installation of Flashings. Brick work is checked for correct installation. All windows and doors are installed with the correct fixings using appropriate blocks and the frame straight, plumb and true.
The installed plaster to the ceilings, wall linings and fitted cornice is checked to ensure it is installed to acceptable standards. Waterproof membrane to showers & wet areas are inspected to ensure they are correctly installed and comply with the requirements of the Building Code.
4. Handover
Handover Inspections require an exhaustive check of the construction. At handover inspection we check that all the work completed “In a proper and workman like manner” ensuring that the workmanship is at an industry standard. The construction of the dwelling needs to reflect the Approved Plans and we check that all components of the building comply with relevant Australian Standards and Building Codes.
Handover or Final stage inspections are also called Practical Completion Inspections (PCI) and Pre Handover Inspections. Handover inspections are generally carried out on new homes when construction of the entire home has been completed and all internal fittings, fixtures and finishes have been installed and applied inside the home compliant with the relevant building plans and specifications.
To arrange a quote or a building inspection for a property in Nara, call Jim’s Building Inspections on 131 546.
Or book your Nara New Home Inspection service online. Reports can be delivered within 24 hours of inspection.
The Case For More Home Inspections
Building surveyors are calling on Victoria’s state government to mandate balcony inspections. This follows the tragic balcony collapse in Doncaster East in late 2017. Sadly, two people died and many others were injured, according to The Age. In ...Read more
A Good Building Inspection Is Better Than An Expensive Cure
Put yourself in Hao’s shoes. He buys his dream home only to discover a buyer’s worst nightmare: most of his buildings are illegal. As the Whittlesea Council says: His bungalow was constructed without a permit. And to add insult to financial in...Read more
How Jim's Building Inspections Became Australia's Number One Choice
Jim’s Building Inspections has grown to become Australia’s largest building inspection business in just three years. How did we do that? It was actually pretty easy, which is probably a damning commentary on the state of the industry! The ...Read more
To Buy Or Not To Buy (Off The Plan)
To buy or not to buy (off the plan) is an important issue for an increasing number of new homebuyers and property investors. When done responsibly with professional guidance (offered by Jim’s Building Inspections, for example) it can be a positi...Read more
Building Inspection Reports - the ultimate negotiation weapon
Rising damp and termite damage. Two issues that would normally send shivers down your spine and see potential buyers running for the hills. But what if you could you turn a negative building inspection report, into the ultimate negotiation weapon?...Read more
Property Management and Smoke Alarms are Good Friends
Property management and smoke alarms are good friends. Or at least they should be. Worst possible scenario: Inaction can lead to deaths and a stint in prison. It’s a familiar story, even in developed countries, however. From one BBC report: “A...Read more
Go With Licensed Pre-Property Inspectors
What makes a good pre-property inspector? Sourceable’s Howard Ryan writes: ‘To do the job properly, a qualified building inspector will have extensive knowledge of the Building Code of Australia, the Building Act, the Building Regulations and var...Read more
Concrete stumps are not immune to decay under extreme conditions.
Many elevated properties sit on some type of stump support whether it be timber , steel , masonry or concrete . Whist most people would consider concrete stumps to be maintenance free , this is far from the truth . Recently one of our Building Inspe...Read more
Fact - Termites Hate Good Building Inspectors
A good building inspector knows how to find termite issues. A bad building inspector, by way of contrast, is a termite’s best friend. When Joe Blow (not his real name) bought a two-bedroom 1920s terrace in Sydney’s inner west for around $1 mil...Read more
Mouldy Issues For Landlords
A growing number of tenants are trying to educate landlords about the many ways in which mould can make us sick. So the ABC’s AM political reporter, Alexandra Beech, took the time to speak to one such person, Caleb Rudd. Mr Rudd is behind a Face...Read more