Building and Pest inspector standing in front of Jims Building Inspections car

Call 131 546 and get a quote or book a New Home Inspection for Fairyland online today.

Jim’s Building Inspections conducts new home inspections (also known as new construction inspections) in Fairyland and the surrounding areas. Our expert consultants can assist you with every stage of your build and ensure your new build meets your expectations and the necessary standards.

Our local consultants have extensive experience and hold public liability and professional indemnity insurance—meaning you can have peace of mind when you acquire the services of a Jim’s Building Inspector.

We offer same day service for New Home Inspections in Fairyland and provide written reports via email within 24 hours of the inspection being conducted.

New Home Inspection Checklist

There are four key inspection stages which can be carried out for New Home Inspections:

1. Slab Stage

The slab stage or the base stage inspection is essential in the inspection process. Finished concrete is inspected to ensure there is an even and consistent finish. The surface should not be powdery or flakey. Levels are checked to confirm the slab has been installed within allowable deviation in the over level across and room or the entire build. The edge rebate is checked to ensure it is not “honeycombed” and there is no evidence of steel reinforcement protruding as it must have at least 40mm concrete coverage. The vapour barrier must extend past the poured concrete slab with adequate overlap left so that it extends up the side wall of the slab past the final finished ground level once the construction is completed.

2. Frame Stage

Frame stage inspections are conducted providing an independent assessment of the works to confirm they have been completed ready for stage payment. Internal checks and company appointed inspections are supported with a fresh and focussed and our review monitors the frame with respect to the approved construction methods stipulated in Australian Standard 1684.2 and the Engineers design requirements as detailed on the Approved Plans.

The installation of windows and door frames are checked at this stage. Frame positioning in relation to the supporting slab is checked with any overhanging tolerances along with load bearing timbers, lintels and orientation of Jack Studs above openings. Items such as the correct number of timber blocks and their securing method are checked along with all bracing, mechanical fasteners, tie downs and anchors.

3. Lockup

At this stage we inspect the roofing that is installed to ensure it is complete and free of defects and damage, all flashings are installed. A visual inspection is carried out to check the installation of Flashings. Brick work is checked for correct installation. All windows and doors are installed with the correct fixings using appropriate blocks and the frame straight, plumb and true.

The installed plaster to the ceilings, wall linings and fitted cornice is checked to ensure it is installed to acceptable standards. Waterproof membrane to showers & wet areas are inspected to ensure they are correctly installed and comply with the requirements of the Building Code.

4. Handover

Handover Inspections require an exhaustive check of the construction. At handover inspection we check that all the work completed “In a proper and workman like manner” ensuring that the workmanship is at an industry standard. The construction of the dwelling needs to reflect the Approved Plans and we check that all components of the building comply with relevant Australian Standards and Building Codes.

Handover or Final stage inspections are also called Practical Completion Inspections (PCI) and Pre Handover Inspections. Handover inspections are generally carried out on new homes when construction of the entire home has been completed and all internal fittings, fixtures and finishes have been installed and applied inside the home compliant with the relevant building plans and specifications.

To arrange a quote or a building inspection for a property in Fairyland, call Jim’s Building Inspections on 131 546.

Or book your Fairyland New Home Inspection service online. Reports can be delivered within 24 hours of inspection.

10 Horrifying Traps a (Good) House Inspector Might Find

Number One: Asbestos. Enough said. Number Two: Termites. In a word: EVIL. Number Three: Fire hazards. Wouldn’t wish this upon my worst enemy. Number Four: Faulty smoke alarms. It’s a thing. Number Five: Ghosts. Okay, kidding. Okay, ma...
Read more

Meth testing - the new norm for prudent home buyers

The New Norm? Including Meth checks in Pre-Purchase Building Inspections For home buyers there is nothing unusual about organising a Pre-Purchase Building Inspection on a potential property purchase. For smart buyers, a Pre-Purchase Building Inspe...
Read more

Asbestos Dumpers Beware

There’s a right way and a wrong way to do a job and this is especially true for asbestos. As the APP reports: People and businesses that illegally transport or dump asbestos in NSW will face on-the-spot fines of up to $15,000 under tough new pen...
Read more

Beware Of Unqualified Building Inspections

How to avoid unqualified building inspections? In a Fairfax article, Chris Dyce, president of the Australian Society of Building Consultants, says go with experienced building inspectors. Make sure they’ve work experience in the industry and don’...
Read more

The first signs that a home could have rotten or sinking stumps

If you are buying your dream home or investment property, it should be remembered that if the property is showing signs of stump damage, it is important to get a professional building consultant to have a look at your property.  A house may appear q...
Read more

How Can I Save Money This Year?

This year has been a year of challenges. These challenging times are leading to many investors asking the question how can I save money this year? One of the ways many investors can save money is by looking for ways to reduce their tax burden. That ...
Read more

The Dirty World Of Termites

This summer it’s time to think pests. "Generally the soil moisture is high, that makes a big difference to termites. Termites are really just organised cockroaches," says Dr Ewart to The Age in an article titled: Hungry termites marching on Melbour...
Read more

Timing of a building inspection

THE TIMING OF A BUILDING INSPECTION MOSTLY DEPENDS ON THE METHOD OF SALE. As the findings of a building inspection report may prompt you to withdraw an offer, you should always ensure that you are correctly informed of your rights and options. This ...
Read more

Property Management and Smoke Alarms are Good Friends

Property management and smoke alarms are good friends. Or at least they should be. Worst possible scenario: Inaction can lead to deaths and a stint in prison. It’s a familiar story, even in developed countries, however. From one BBC report: “A...
Read more

Mouldy Issues For Landlords

A growing number of tenants are trying to educate landlords about the many ways in which mould can make us sick. So the ABC’s AM political reporter, Alexandra Beech, took the time to speak to one such person, Caleb Rudd. Mr Rudd is behind a Face...
Read more


In Fairyland

qld Suburbs Index

New Home Inspections suburbs in chinchilla region