Call 131546 and get a quote or book a New Home Inspection for Routh online today.

Jim’s Building Inspections conducts new home inspections (also known as new construction inspections) in Routh and the surrounding areas. Our expert consultants can assist you with every stage of your build and ensure your new build meets your expectations and the necessary standards.

Our local consultants have extensive experience and hold public liability and professional indemnity insurance—meaning you can have peace of mind when you acquire the services of a Jim’s Building Inspector.

We offer same day service for New Home Inspections in Routh and provide written reports via email within 24 hours of the inspection being conducted.

 

New Home Inspection Checklist

There are four key inspection stages which can be carried out for New Home Inspections:


Slab Stage

The slab stage or the base stage inspection is essential in the inspection process. Finished concrete is inspected to ensure there is an even and consistent finish. The surface should not be powdery or flakey. Levels are checked to confirm the slab has been installed within allowable deviation in the over level across and room or the entire build. The edge rebate is checked to ensure it is not “honeycombed” and there is no evidence of steel reinforcement protruding as it must have at least 40mm concrete coverage. The vapour barrier must extend past the poured concrete slab with adequate overlap left so that it extends up the side wall of the slab past the final finished ground level once the construction is completed.

 

Frame Stage

Frame stage inspections are conducted providing an independent assessment of the works to confirm they have been completed ready for stage payment. Internal checks and company appointed inspections are supported with a fresh and focussed and our review monitors the frame with respect to the approved construction methods stipulated in Australian Standard 1684.2 and the Engineers design requirements as detailed on the Approved Plans.

The installation of windows and door frames are checked at this stage. Frame positioning in relation to the supporting slab is checked with any overhanging tolerances along with load bearing timbers, lintels and orientation of Jack Studs above openings. Items such as the correct number of timber blocks and their securing method are checked along with all bracing, mechanical fasteners, tie downs and anchors.

 

Lockup

At this stage we inspect the roofing that is installed to ensure it is complete and free of defects and damage, all flashings are installed. A visual inspection is carried out to check the installation of Flashings. Brick work is checked for correct installation. All windows and doors are installed with the correct fixings using appropriate blocks and the frame straight, plumb and true.

The installed plaster to the ceilings, wall linings and fitted cornice is checked to ensure it is installed to acceptable standards. Waterproof membrane to showers & wet areas are inspected to ensure they are correctly installed and comply with the requirements of the Building Code.

 

Handover

Handover Inspections require an exhaustive check of the construction. At handover inspection we check that all the work completed “In a proper and workman like manner” ensuring that the workmanship is at an industry standard. The construction of the dwelling needs to reflect the Approved Plans and we check that all components of the building comply with relevant Australian Standards and Building Codes.

Handover or Final stage inspections are also called Practical Completion Inspections (PCI) and Pre Handover Inspections. Handover inspections are generally carried out on new homes when construction of the entire home has been completed and all internal fittings, fixtures and finishes have been installed and applied inside the home compliant with the relevant building plans and specifications.

 

To arrange a quote or a building inspection for a property in Routh, call Jim’s Building Inspections on 131546.
Or book your Routh New Home Inspection service online. Reports can be delivered within 24 hours of inspection.

House Inspections Take Time

Okay, random question: How long would you spend inspecting a house before buying it? In Australia, more than half of homeowners (58%) spend less than an hour inspecting before the big buy, according to research put out by ME bank. Thus, it’s not...
Read more

Safety Reversal Check For Automatic Garage Door

In most houses, the largest moving object is a garage door. Newer garage doors are often operated remotely through radio controls, electrical systems, pulleys and motors. Serious injury or death from being hit by a closing garage door or from bein...
Read more

Asbestos In The News

Think asbestos is old news – and not relevant in today’s society? Think again. Here’s one of many asbestos-related news stories. From the Western Advocate: WORK on Bathurst Tennis Centre’s new $800,000 clubhouse has come to a halt after...
Read more

How Can I Save Money This Year?

This year has been a year of challenges. These challenging times are leading to many investors asking the question how can I save money this year? One of the ways many investors can save money is by looking for ways to reduce their tax burden. That ...
Read more

Termite Damage Is Leading Factor When Buying Queensland Homes

Are you buying a home or investment property in Queensland? Amongst the important things to consider is the termite and borer status of your intended property. It is recommended that you should always have both a pre-purchase building inspection a...
Read more

Property Styling - the Melbourne stats

Property Styling, Melbourne, works. If you were considering property styling in Melbourne as part of your sale campaign, you can now rest easy knowing that every dollar invested in property styling is likely to return over $1900 to your back pocket ...
Read more

To Buy Or Not To Buy (Off The Plan)

To buy or not to buy (off the plan) is an important issue for an increasing number of new homebuyers and property investors. When done responsibly with professional guidance (offered by Jim’s Building Inspections, for example) it can be a positi...
Read more

Inadequate Site and subfloor drainage

A sub-floor is the structure and crawl space between the lowest floor and the ground. High moisture levels in these areas promote fungal decay and other timber pests such as termites. All sub-floors and crawl spaces should be considered as having ...
Read more

Beware Of Unqualified Building Inspections

How to avoid unqualified building inspections? In a Fairfax article, Chris Dyce, president of the Australian Society of Building Consultants, says go with experienced building inspectors. Make sure they’ve work experience in the industry and don’...
Read more

How is a House Inspection Organised?

Whilst it’s up to you, the majority of our clients simply provide the Real Estate Agents details and then we will then contact them to organise the date and time of the house inspection. Generally this saves you a few more phone calls and emails...
Read more


In Routh

qld Suburbs Index

New Home Inspections suburbs in georgetown region