Building and Pest inspector standing in front of Jims Building Inspections car

Call 131 546 and get a quote or book a New Home Inspection for Oyster Creek online today.

Jim’s Building Inspections conducts new home inspections (also known as new construction inspections) in Oyster Creek and the surrounding areas. Our expert consultants can assist you with every stage of your build and ensure your new build meets your expectations and the necessary standards.

Our local consultants have extensive experience and hold public liability and professional indemnity insurance—meaning you can have peace of mind when you acquire the services of a Jim’s Building Inspector.

We offer same day service for New Home Inspections in Oyster Creek and provide written reports via email within 24 hours of the inspection being conducted.

New Home Inspection Checklist

There are four key inspection stages which can be carried out for New Home Inspections:

1. Slab Stage

The slab stage or the base stage inspection is essential in the inspection process. Finished concrete is inspected to ensure there is an even and consistent finish. The surface should not be powdery or flakey. Levels are checked to confirm the slab has been installed within allowable deviation in the over level across and room or the entire build. The edge rebate is checked to ensure it is not “honeycombed” and there is no evidence of steel reinforcement protruding as it must have at least 40mm concrete coverage. The vapour barrier must extend past the poured concrete slab with adequate overlap left so that it extends up the side wall of the slab past the final finished ground level once the construction is completed.

2. Frame Stage

Frame stage inspections are conducted providing an independent assessment of the works to confirm they have been completed ready for stage payment. Internal checks and company appointed inspections are supported with a fresh and focussed and our review monitors the frame with respect to the approved construction methods stipulated in Australian Standard 1684.2 and the Engineers design requirements as detailed on the Approved Plans.

The installation of windows and door frames are checked at this stage. Frame positioning in relation to the supporting slab is checked with any overhanging tolerances along with load bearing timbers, lintels and orientation of Jack Studs above openings. Items such as the correct number of timber blocks and their securing method are checked along with all bracing, mechanical fasteners, tie downs and anchors.

3. Lockup

At this stage we inspect the roofing that is installed to ensure it is complete and free of defects and damage, all flashings are installed. A visual inspection is carried out to check the installation of Flashings. Brick work is checked for correct installation. All windows and doors are installed with the correct fixings using appropriate blocks and the frame straight, plumb and true.

The installed plaster to the ceilings, wall linings and fitted cornice is checked to ensure it is installed to acceptable standards. Waterproof membrane to showers & wet areas are inspected to ensure they are correctly installed and comply with the requirements of the Building Code.

4. Handover

Handover Inspections require an exhaustive check of the construction. At handover inspection we check that all the work completed “In a proper and workman like manner” ensuring that the workmanship is at an industry standard. The construction of the dwelling needs to reflect the Approved Plans and we check that all components of the building comply with relevant Australian Standards and Building Codes.

Handover or Final stage inspections are also called Practical Completion Inspections (PCI) and Pre Handover Inspections. Handover inspections are generally carried out on new homes when construction of the entire home has been completed and all internal fittings, fixtures and finishes have been installed and applied inside the home compliant with the relevant building plans and specifications.

To arrange a quote or a building inspection for a property in Oyster Creek, call Jim’s Building Inspections on 131 546.

Or book your Oyster Creek New Home Inspection service online. Reports can be delivered within 24 hours of inspection.

Blocked Guttering- One of the most Common Pre-Purchase Defects

Blocked gutters are one of the main defects found during a pre purchase inspection and is also one of the easiest to fix and prevent. Doing something as simple as keeping your gutters clean can save you thousands of dollars in maintenance costs in th...
Read more

What is Caveat Emptor?

Increasingly property buyers are aware of their responsibility to discover building defects before sale – this is known as the Latin principle Caveat Emptor or ‘buyer beware’. The full quotation is ‘caveat emptor, qui ignorare no...
Read more

How Different Methods of Property Sale Impact When You Need a Building Inspection

THE TIMING OF A BUILDING INSPECTION DEPENDS ON YOUR SITUATION AND MOSTLY THE METHOD OF SALE. As the findings of a building inspection report may cause you to withdraw an offer you should always ensure that you are informed of your ri...
Read more

Tax Depreciation Schedules

Did you know Jim’s Building Inspections have now started providing Tax Depreciation Schedules for Property Investors around the country?  Why? Our Inspectors are in thousands of homes and apartments everyday conducting Pre-Purchase Building Ins...
Read more

Why arranging a Pre-Sale inspection can give you an advantage

If you’re thinking about listing your home for sale, it is the perfect time to look at anything you may need to fix or repair. You’re probably used to the ceiling water stains and spots of mould in your kitchen cupboards, but these minor defects ...
Read more

Am I An Owner Builder?

Whether you are or aren’t an owner builder can sometimes be a tricky concept to get your head around. Even if you didn’t personally lift a hammer, but rather project managed different trades to do the work, – you are still, legally, the owne...
Read more

Timing of a building inspection

THE TIMING OF A BUILDING INSPECTION MOSTLY DEPENDS ON THE METHOD OF SALE. As the findings of a building inspection report may prompt you to withdraw an offer, you should always ensure that you are correctly informed of your rights and options. This ...
Read more

Tips For First Home Buyers.

With government policy and a market that has cooled in recent times, the opportunities for first home buyers is really exciting. The dream of buying your first home is becoming a reality. There are however so many factors to look out for before you r...
Read more

10 Horrifying Traps a (Good) House Inspector Might Find

Number One: Asbestos. Enough said. Number Two: Termites. In a word: EVIL. Number Three: Fire hazards. Wouldn’t wish this upon my worst enemy. Number Four: Faulty smoke alarms. It’s a thing. Number Five: Ghosts. Okay, kidding. Okay, ma...
Read more

Jim's Building Inspections hits 100 Franchisees!

Jim's Building Inspections is pleased to announce that September 2017 saw its 100th Franchisee sign on to Jim's Building Inspections, officially launching the division as one of the biggest building inspection companies in Australia. Director Paul...
Read more


In Oyster Creek

qld Suburbs Index

New Home Inspections suburbs in gladstone region