Building and Pest inspector standing in front of Jims Building Inspections car

Call 131 546 and get a quote or book a New Home Inspection for Bamboo Creek online today.

Jim’s Building Inspections conducts new home inspections (also known as new construction inspections) in Bamboo Creek and the surrounding areas. Our expert consultants can assist you with every stage of your build and ensure your new build meets your expectations and the necessary standards.

Our local consultants have extensive experience and hold public liability and professional indemnity insurance—meaning you can have peace of mind when you acquire the services of a Jim’s Building Inspector.

We offer same day service for New Home Inspections in Bamboo Creek and provide written reports via email within 24 hours of the inspection being conducted.

New Home Inspection Checklist

There are four key inspection stages which can be carried out for New Home Inspections:

1. Slab Stage

The slab stage or the base stage inspection is essential in the inspection process. Finished concrete is inspected to ensure there is an even and consistent finish. The surface should not be powdery or flakey. Levels are checked to confirm the slab has been installed within allowable deviation in the over level across and room or the entire build. The edge rebate is checked to ensure it is not “honeycombed” and there is no evidence of steel reinforcement protruding as it must have at least 40mm concrete coverage. The vapour barrier must extend past the poured concrete slab with adequate overlap left so that it extends up the side wall of the slab past the final finished ground level once the construction is completed.

2. Frame Stage

Frame stage inspections are conducted providing an independent assessment of the works to confirm they have been completed ready for stage payment. Internal checks and company appointed inspections are supported with a fresh and focussed and our review monitors the frame with respect to the approved construction methods stipulated in Australian Standard 1684.2 and the Engineers design requirements as detailed on the Approved Plans.

The installation of windows and door frames are checked at this stage. Frame positioning in relation to the supporting slab is checked with any overhanging tolerances along with load bearing timbers, lintels and orientation of Jack Studs above openings. Items such as the correct number of timber blocks and their securing method are checked along with all bracing, mechanical fasteners, tie downs and anchors.

3. Lockup

At this stage we inspect the roofing that is installed to ensure it is complete and free of defects and damage, all flashings are installed. A visual inspection is carried out to check the installation of Flashings. Brick work is checked for correct installation. All windows and doors are installed with the correct fixings using appropriate blocks and the frame straight, plumb and true.

The installed plaster to the ceilings, wall linings and fitted cornice is checked to ensure it is installed to acceptable standards. Waterproof membrane to showers & wet areas are inspected to ensure they are correctly installed and comply with the requirements of the Building Code.

4. Handover

Handover Inspections require an exhaustive check of the construction. At handover inspection we check that all the work completed “In a proper and workman like manner” ensuring that the workmanship is at an industry standard. The construction of the dwelling needs to reflect the Approved Plans and we check that all components of the building comply with relevant Australian Standards and Building Codes.

Handover or Final stage inspections are also called Practical Completion Inspections (PCI) and Pre Handover Inspections. Handover inspections are generally carried out on new homes when construction of the entire home has been completed and all internal fittings, fixtures and finishes have been installed and applied inside the home compliant with the relevant building plans and specifications.

To arrange a quote or a building inspection for a property in Bamboo Creek, call Jim’s Building Inspections on 131 546.

Or book your Bamboo Creek New Home Inspection service online. Reports can be delivered within 24 hours of inspection.

Tips For First Home Buyers.

With government policy and a market that has cooled in recent times, the opportunities for first home buyers is really exciting. The dream of buying your first home is becoming a reality. There are however so many factors to look out for before you r...
Read more

Passing Your Next Rental Inspection With Mould-Busting Professionals

What’s one thing landlords despise? If you guessed mould, you’re right. “The obvious things we look for are mould in the bathrooms/cupboards/bedrooms,” says one expert in the field. “This is usually an indication that the tenant isn’t ...
Read more

The Science Of Inspections

There’s a science to property inspections. Seriously. Because while your average inspector can and does spot problems, a trained inspector can find problems behind problems and other easy-to-miss issues. What’s more, he or she is less likely t...
Read more

The Dirt On Property Depreciation

What’s depreciation? In a nutshell, it’s an allowance under tax laws in Australia for investors. It means they can claim deductions for expenditures in their property investments. Why depreciation? Even extremely well-built houses aren’t imm...
Read more

WHAT’S THE MOST COMMON BUILDING INSPECTIONS SIGNIFICANT DEFECT?

Over the past two years, the most common Significant defect found, is the damp shower. Modern showers are aesthetically pleasing and appear to be installed to the highest standard. However, countless showers have been found this year to have damp cor...
Read more

To Buy Or Not To Buy (Off The Plan)

To buy or not to buy (off the plan) is an important issue for an increasing number of new homebuyers and property investors. When done responsibly with professional guidance (offered by Jim’s Building Inspections, for example) it can be a positi...
Read more

Building? Here Are Mark Campbell's Lessons Learned

“My rationale for building new was threefold,” writes Mark Campbell, a working-class Aussie. “Firstly, it enabled me to have control over the end product and it made sense from an investment perspective because I could maximise depreciation and...
Read more

How Different Methods of Property Sale Impact When You Need a Building Inspection

THE TIMING OF A BUILDING INSPECTION DEPENDS ON YOUR SITUATION AND MOSTLY THE METHOD OF SALE. As the findings of a building inspection report may cause you to withdraw an offer you should always ensure that you are informed of your ri...
Read more

Mouldy Issues For Landlords

A growing number of tenants are trying to educate landlords about the many ways in which mould can make us sick. So the ABC’s AM political reporter, Alexandra Beech, took the time to speak to one such person, Caleb Rudd. Mr Rudd is behind a Face...
Read more

What's involved in a home inspection?

Most of the time we never get to meet our clients face to face and only a small handful are ever able to come along to the home inspections we organise. So there is often a bit of mystery around what exactly we do during a home inspection. ...
Read more


In Bamboo Creek

qld Suburbs Index

New Home Inspections suburbs in innisfail region