Building and Pest inspector standing in front of Jims Building Inspections car

Call 131 546 and get a quote or book a New Home Inspection for Mungana online today.

Jim’s Building Inspections conducts new home inspections (also known as new construction inspections) in Mungana and the surrounding areas. Our expert consultants can assist you with every stage of your build and ensure your new build meets your expectations and the necessary standards.

Our local consultants have extensive experience and hold public liability and professional indemnity insurance—meaning you can have peace of mind when you acquire the services of a Jim’s Building Inspector.

We offer same day service for New Home Inspections in Mungana and provide written reports via email within 24 hours of the inspection being conducted.

New Home Inspection Checklist

There are four key inspection stages which can be carried out for New Home Inspections:

1. Slab Stage

The slab stage or the base stage inspection is essential in the inspection process. Finished concrete is inspected to ensure there is an even and consistent finish. The surface should not be powdery or flakey. Levels are checked to confirm the slab has been installed within allowable deviation in the over level across and room or the entire build. The edge rebate is checked to ensure it is not “honeycombed” and there is no evidence of steel reinforcement protruding as it must have at least 40mm concrete coverage. The vapour barrier must extend past the poured concrete slab with adequate overlap left so that it extends up the side wall of the slab past the final finished ground level once the construction is completed.

2. Frame Stage

Frame stage inspections are conducted providing an independent assessment of the works to confirm they have been completed ready for stage payment. Internal checks and company appointed inspections are supported with a fresh and focussed and our review monitors the frame with respect to the approved construction methods stipulated in Australian Standard 1684.2 and the Engineers design requirements as detailed on the Approved Plans.

The installation of windows and door frames are checked at this stage. Frame positioning in relation to the supporting slab is checked with any overhanging tolerances along with load bearing timbers, lintels and orientation of Jack Studs above openings. Items such as the correct number of timber blocks and their securing method are checked along with all bracing, mechanical fasteners, tie downs and anchors.

3. Lockup

At this stage we inspect the roofing that is installed to ensure it is complete and free of defects and damage, all flashings are installed. A visual inspection is carried out to check the installation of Flashings. Brick work is checked for correct installation. All windows and doors are installed with the correct fixings using appropriate blocks and the frame straight, plumb and true.

The installed plaster to the ceilings, wall linings and fitted cornice is checked to ensure it is installed to acceptable standards. Waterproof membrane to showers & wet areas are inspected to ensure they are correctly installed and comply with the requirements of the Building Code.

4. Handover

Handover Inspections require an exhaustive check of the construction. At handover inspection we check that all the work completed “In a proper and workman like manner” ensuring that the workmanship is at an industry standard. The construction of the dwelling needs to reflect the Approved Plans and we check that all components of the building comply with relevant Australian Standards and Building Codes.

Handover or Final stage inspections are also called Practical Completion Inspections (PCI) and Pre Handover Inspections. Handover inspections are generally carried out on new homes when construction of the entire home has been completed and all internal fittings, fixtures and finishes have been installed and applied inside the home compliant with the relevant building plans and specifications.

To arrange a quote or a building inspection for a property in Mungana, call Jim’s Building Inspections on 131 546.

Or book your Mungana New Home Inspection service online. Reports can be delivered within 24 hours of inspection.

Meth testing - the new norm for prudent home buyers

The New Norm? Including Meth checks in Pre-Purchase Building Inspections For home buyers there is nothing unusual about organising a Pre-Purchase Building Inspection on a potential property purchase. For smart buyers, a Pre-Purchase Building Inspe...
Read more

Re-stumping red flags

A guide to Re-Stumping Re-stumping - or re-blocking as it's known in Victoria - is big business in Australia and can be a very costly exercise, particularly if you don't know what you're looking at and you don't understand what you've bought into....
Read more

Go With Licensed Pre-Property Inspectors

What makes a good pre-property inspector? Sourceable’s Howard Ryan writes: ‘To do the job properly, a qualified building inspector will have extensive knowledge of the Building Code of Australia, the Building Act, the Building Regulations and var...
Read more

Proposed New Tax To Help Home Owners Remove Asbestos

Did you know that 1 in 3 Australian homes contain asbestos? With home renovations on the rise, many Australian's are purchasing homes built before 1985 with the intention of doing small renos through to complete rebuilds. Unfortunately, many people a...
Read more

How do I go back to my home after Fire Damage?

A fire is a traumatic experience, and it can cause more damage than what you can see initially. Beyond the physical fire damage, you must also consider the smoke and soot contamination. Both can be dangerous and costly. Fire damage can extend to t...
Read more

EXPLAINED – Owner Builder Warranty Inspections & S137B of the Victoria Building Act 1993

You're an owner builder and it is time to sell your home. The last thing you want is for your hard work to be a hindrance to potential purchasers who have reservations about quality or compliance, just because the works weren't part of a major domest...
Read more

Am I An Owner Builder?

Whether you are or aren’t an owner builder can sometimes be a tricky concept to get your head around. Even if you didn’t personally lift a hammer, but rather project managed different trades to do the work, – you are still, legally, the owne...
Read more

Buying Off-The-Plan Housing Needn't Be Scary

Buying an off-the-plan house needn’t be scary if you make smart choices. One important choice: Seeking out experts in New Construction – and Jim’s Building Inspections is a good place to start. Buying off-the-plan with professional guidan...
Read more

Mould - The Silent Killer

Mould: Ugly, yes. But the health consequences of inaction are uglier. Gizmodo explains: “A common mould called Aspergillus, when inhaled by particularly susceptible people, can infect the lungs and spread throughout the body. Other moulds that ...
Read more

Why Rental Safety Inspections Matter

“When Jonathan’s family rented a home they began experiencing recurring headaches,” reports news.com.au. “Then they made a shocking discovery.” It turns out that Jonathan and even his children were victims of dangerous traces of crystal ...
Read more


In Mungana

qld Suburbs Index

New Home Inspections suburbs in mareeba region