New Home Inspection Checklist
There are four key inspection stages which can be carried out for New Home Inspections:
1. Slab Stage
The slab stage or the base stage inspection is essential in the inspection process. Finished concrete is inspected to ensure there is an even and consistent finish. The surface should not be powdery or flakey. Levels are checked to confirm the slab has been installed within allowable deviation in the over level across and room or the entire build. The edge rebate is checked to ensure it is not “honeycombed” and there is no evidence of steel reinforcement protruding as it must have at least 40mm concrete coverage. The vapour barrier must extend past the poured concrete slab with adequate overlap left so that it extends up the side wall of the slab past the final finished ground level once the construction is completed.
2. Frame Stage
Frame stage inspections are conducted providing an independent assessment of the works to confirm they have been completed ready for stage payment. Internal checks and company appointed inspections are supported with a fresh and focussed and our review monitors the frame with respect to the approved construction methods stipulated in Australian Standard 1684.2 and the Engineers design requirements as detailed on the Approved Plans.
The installation of windows and door frames are checked at this stage. Frame positioning in relation to the supporting slab is checked with any overhanging tolerances along with load bearing timbers, lintels and orientation of Jack Studs above openings. Items such as the correct number of timber blocks and their securing method are checked along with all bracing, mechanical fasteners, tie downs and anchors.
3. Lockup
At this stage we inspect the roofing that is installed to ensure it is complete and free of defects and damage, all flashings are installed. A visual inspection is carried out to check the installation of Flashings. Brick work is checked for correct installation. All windows and doors are installed with the correct fixings using appropriate blocks and the frame straight, plumb and true.
The installed plaster to the ceilings, wall linings and fitted cornice is checked to ensure it is installed to acceptable standards. Waterproof membrane to showers & wet areas are inspected to ensure they are correctly installed and comply with the requirements of the Building Code.
4. Handover
Handover Inspections require an exhaustive check of the construction. At handover inspection we check that all the work completed “In a proper and workman like manner” ensuring that the workmanship is at an industry standard. The construction of the dwelling needs to reflect the Approved Plans and we check that all components of the building comply with relevant Australian Standards and Building Codes.
Handover or Final stage inspections are also called Practical Completion Inspections (PCI) and Pre Handover Inspections. Handover inspections are generally carried out on new homes when construction of the entire home has been completed and all internal fittings, fixtures and finishes have been installed and applied inside the home compliant with the relevant building plans and specifications.
To arrange a quote or a building inspection for a property in Tiaro, call Jim’s Building Inspections on 131 546.
Or book your Tiaro New Home Inspection service online. Reports can be delivered within 24 hours of inspection.
Asbestos-Caused Cancer Trends Up
Asbestos-caused cancers are trending up, according to recent data from 2017. The grim facts from the Australian Institute of Health and Welfare: 710 Australians were diagnosed with mesothelioma in 2016 – a cancer caused by exposure to asbesto...Read more
Building? Here Are Mark Campbell's Lessons Learned
“My rationale for building new was threefold,” writes Mark Campbell, a working-class Aussie. “Firstly, it enabled me to have control over the end product and it made sense from an investment perspective because I could maximise depreciation and...Read more
Things to consider when building your first home
You might decide that rather than buying an established property as your first home, it would better suit you to build. Building your first home can be both an exciting and overwhelming experience. Building allows you to customise your home from t...Read more
Re-stumping red flags
A guide to Re-Stumping Re-stumping - or re-blocking as it's known in Victoria - is big business in Australia and can be a very costly exercise, particularly if you don't know what you're looking at and you don't understand what you've bought into....Read more
How To Avoid Renovation Traps
Renovations done right can pay off. Literally. That said there are some serious traps to avoid. Potential problems from wiring to asbestos issues often come up especially in older houses, so it’s important to seek professional help. Jim’s Buil...Read more
Property Styling - the Melbourne stats
Property Styling, Melbourne, works. If you were considering property styling in Melbourne as part of your sale campaign, you can now rest easy knowing that every dollar invested in property styling is likely to return over $1900 to your back pocket ...Read more
Three Simple Ways To Fight Mould
Some things are out of our control. Others are in our control. Thus, when speaking about mould, there are many things we can do. One: Root causes. Find them. A good place to start: Jim’s Building Inspections. When mould is found by experts it’...Read more
Tax Depreciation Schedules
Did you know Jim’s Building Inspections have now started providing Tax Depreciation Schedules for Property Investors around the country? Why? Our Inspectors are in thousands of homes and apartments everyday conducting Pre-Purchase Building Ins...Read more
Timing of a building inspection
THE TIMING OF A BUILDING INSPECTION MOSTLY DEPENDS ON THE METHOD OF SALE. As the findings of a building inspection report may prompt you to withdraw an offer, you should always ensure that you are correctly informed of your rights and options. This ...Read more
House Inspections Take Time
Okay, random question: How long would you spend inspecting a house before buying it? In Australia, more than half of homeowners (58%) spend less than an hour inspecting before the big buy, according to research put out by ME bank. Thus, it’s not...Read more