Building and Pest inspector standing in front of Jims Building Inspections car

Call 131 546 and get a quote or book a New Home Inspection for Blanchview online today.

Jim’s Building Inspections conducts new home inspections (also known as new construction inspections) in Blanchview and the surrounding areas. Our expert consultants can assist you with every stage of your build and ensure your new build meets your expectations and the necessary standards.

Our local consultants have extensive experience and hold public liability and professional indemnity insurance—meaning you can have peace of mind when you acquire the services of a Jim’s Building Inspector.

We offer same day service for New Home Inspections in Blanchview and provide written reports via email within 24 hours of the inspection being conducted.

New Home Inspection Checklist

There are four key inspection stages which can be carried out for New Home Inspections:

1. Slab Stage

The slab stage or the base stage inspection is essential in the inspection process. Finished concrete is inspected to ensure there is an even and consistent finish. The surface should not be powdery or flakey. Levels are checked to confirm the slab has been installed within allowable deviation in the over level across and room or the entire build. The edge rebate is checked to ensure it is not “honeycombed” and there is no evidence of steel reinforcement protruding as it must have at least 40mm concrete coverage. The vapour barrier must extend past the poured concrete slab with adequate overlap left so that it extends up the side wall of the slab past the final finished ground level once the construction is completed.

2. Frame Stage

Frame stage inspections are conducted providing an independent assessment of the works to confirm they have been completed ready for stage payment. Internal checks and company appointed inspections are supported with a fresh and focussed and our review monitors the frame with respect to the approved construction methods stipulated in Australian Standard 1684.2 and the Engineers design requirements as detailed on the Approved Plans.

The installation of windows and door frames are checked at this stage. Frame positioning in relation to the supporting slab is checked with any overhanging tolerances along with load bearing timbers, lintels and orientation of Jack Studs above openings. Items such as the correct number of timber blocks and their securing method are checked along with all bracing, mechanical fasteners, tie downs and anchors.

3. Lockup

At this stage we inspect the roofing that is installed to ensure it is complete and free of defects and damage, all flashings are installed. A visual inspection is carried out to check the installation of Flashings. Brick work is checked for correct installation. All windows and doors are installed with the correct fixings using appropriate blocks and the frame straight, plumb and true.

The installed plaster to the ceilings, wall linings and fitted cornice is checked to ensure it is installed to acceptable standards. Waterproof membrane to showers & wet areas are inspected to ensure they are correctly installed and comply with the requirements of the Building Code.

4. Handover

Handover Inspections require an exhaustive check of the construction. At handover inspection we check that all the work completed “In a proper and workman like manner” ensuring that the workmanship is at an industry standard. The construction of the dwelling needs to reflect the Approved Plans and we check that all components of the building comply with relevant Australian Standards and Building Codes.

Handover or Final stage inspections are also called Practical Completion Inspections (PCI) and Pre Handover Inspections. Handover inspections are generally carried out on new homes when construction of the entire home has been completed and all internal fittings, fixtures and finishes have been installed and applied inside the home compliant with the relevant building plans and specifications.

To arrange a quote or a building inspection for a property in Blanchview, call Jim’s Building Inspections on 131 546.

Or book your Blanchview New Home Inspection service online. Reports can be delivered within 24 hours of inspection.

Asbestos Imports - A Health Concern

If you follow the news, you’ll be aware that Chinese companies have been exporting asbestos products to Australia. But did you know that they’re not alone? There’s a long list of countries exporting products with asbestos to Australia. They ...
Read more

Common defects found in homes

Are you buying a home or investment property? Here are some of the common defects that our building inspectors in homes. Termite damage The advantages of getting a vendor report before putting your house on the market. Termite damage was found ...
Read more

The Science Of Inspections

There’s a science to property inspections. Seriously. Because while your average inspector can and does spot problems, a trained inspector can find problems behind problems and other easy-to-miss issues. What’s more, he or she is less likely t...
Read more

Two Things You Need To Know About Smoke Alarms

One: Smoke Alarms Aren’t Always Reliable Smoke alarms aren’t always reliable which is why a professional inspector can make your job easier and life safer. A good inspection takes into account adequate positioning and operational status in orde...
Read more

The Case For More Home Inspections

Building surveyors are calling on Victoria’s state government to mandate balcony inspections. This follows the tragic balcony collapse in Doncaster East in late 2017. Sadly, two people died and many others were injured, according to The Age. In ...
Read more

EXPLAINED – Owner Builder Warranty Inspections & S137B of the Victoria Building Act 1993

You're an owner builder and it is time to sell your home. The last thing you want is for your hard work to be a hindrance to potential purchasers who have reservations about quality or compliance, just because the works weren't part of a major domest...
Read more

Buying Off-The-Plan Housing Needn't Be Scary

Buying an off-the-plan house needn’t be scary if you make smart choices. One important choice: Seeking out experts in New Construction – and Jim’s Building Inspections is a good place to start. Buying off-the-plan with professional guidan...
Read more

Is your house cracking up?

Is your house cracking up? A long, spidery vein is inching its way across the dining room wall. It seems to be spreading even as you stare at it! You’re sure it wasn’t there yesterday! So what does this mean and how can it be fixed? Don’t...
Read more

How Can I Save Money This Year?

This year has been a year of challenges. These challenging times are leading to many investors asking the question how can I save money this year? One of the ways many investors can save money is by looking for ways to reduce their tax burden. That ...
Read more

The Dirt On Property Depreciation

What’s depreciation? In a nutshell, it’s an allowance under tax laws in Australia for investors. It means they can claim deductions for expenditures in their property investments. Why depreciation? Even extremely well-built houses aren’t imm...
Read more


In Blanchview

qld Suburbs Index

New Home Inspections suburbs in toowoomba region