Call 131 546 and get a quote or book a New Home Inspection for Bylong online today.
Jim’s Building Inspections conducts new home inspections (also known as new construction inspections) in Bylong and the surrounding areas. Our expert consultants can assist you with every stage of your build and ensure your new build meets your expectations and the necessary standards.
Our local consultants have extensive experience and hold public liability and professional indemnity insurance—meaning you can have peace of mind when you acquire the services of a Jim’s Building Inspector.
We offer same day service for New Home Inspections in Bylong and provide written reports via email within 24 hours of the inspection being conducted.
New Home Inspection Checklist
There are four key inspection stages which can be carried out for New Home Inspections:
1. Slab Stage
The slab stage or the base stage inspection is essential in the inspection process. Finished concrete is inspected to ensure there is an even and consistent finish. The surface should not be powdery or flakey. Levels are checked to confirm the slab has been installed within allowable deviation in the over level across and room or the entire build. The edge rebate is checked to ensure it is not “honeycombed” and there is no evidence of steel reinforcement protruding as it must have at least 40mm concrete coverage. The vapour barrier must extend past the poured concrete slab with adequate overlap left so that it extends up the side wall of the slab past the final finished ground level once the construction is completed.
2. Frame Stage
Frame stage inspections are conducted providing an independent assessment of the works to confirm they have been completed ready for stage payment. Internal checks and company appointed inspections are supported with a fresh and focussed and our review monitors the frame with respect to the approved construction methods stipulated in Australian Standard 1684.2 and the Engineers design requirements as detailed on the Approved Plans.
The installation of windows and door frames are checked at this stage. Frame positioning in relation to the supporting slab is checked with any overhanging tolerances along with load bearing timbers, lintels and orientation of Jack Studs above openings. Items such as the correct number of timber blocks and their securing method are checked along with all bracing, mechanical fasteners, tie downs and anchors.
3. Lockup
At this stage we inspect the roofing that is installed to ensure it is complete and free of defects and damage, all flashings are installed. A visual inspection is carried out to check the installation of Flashings. Brick work is checked for correct installation. All windows and doors are installed with the correct fixings using appropriate blocks and the frame straight, plumb and true.
The installed plaster to the ceilings, wall linings and fitted cornice is checked to ensure it is installed to acceptable standards. Waterproof membrane to showers & wet areas are inspected to ensure they are correctly installed and comply with the requirements of the Building Code.
4. Handover
Handover Inspections require an exhaustive check of the construction. At handover inspection we check that all the work completed “In a proper and workman like manner” ensuring that the workmanship is at an industry standard. The construction of the dwelling needs to reflect the Approved Plans and we check that all components of the building comply with relevant Australian Standards and Building Codes.
Handover or Final stage inspections are also called Practical Completion Inspections (PCI) and Pre Handover Inspections. Handover inspections are generally carried out on new homes when construction of the entire home has been completed and all internal fittings, fixtures and finishes have been installed and applied inside the home compliant with the relevant building plans and specifications.
To arrange a quote or a building inspection for a property in Bylong, call Jim’s Building Inspections on 131 546.
Or book your Bylong New Home Inspection service online. Reports can be delivered within 24 hours of inspection.
Is Your Smoke Alarm Up To Scratch
Fires can spread rapidly (in less than five minutes) through your house, according to findings from a Fire & Rescue NSW report. Interesting also is that homeowners are encouraged to look at how many fire alarms in their house to cover all potenti...Read more
Mould - The Silent Killer
Mould: Ugly, yes. But the health consequences of inaction are uglier. Gizmodo explains: “A common mould called Aspergillus, when inhaled by particularly susceptible people, can infect the lungs and spread throughout the body. Other moulds that ...Read more
Who Needs a Building Inspection?
Building Inspections are generally ordered in the process of buying or selling a home. A building inspection may also be required if you discover that your home has developed a building defect over time or in response to an incident or accident. ...Read more
Tax Depreciation Schedules
Did you know Jim’s Building Inspections have now started providing Tax Depreciation Schedules for Property Investors around the country? Why? Our Inspectors are in thousands of homes and apartments everyday conducting Pre-Purchase Building Ins...Read more
The Science Of Inspections
There’s a science to property inspections. Seriously. Because while your average inspector can and does spot problems, a trained inspector can find problems behind problems and other easy-to-miss issues. What’s more, he or she is less likely t...Read more
Building? Here Are Mark Campbell's Lessons Learned
“My rationale for building new was threefold,” writes Mark Campbell, a working-class Aussie. “Firstly, it enabled me to have control over the end product and it made sense from an investment perspective because I could maximise depreciation and...Read more
Timing of a building inspection
THE TIMING OF A BUILDING INSPECTION MOSTLY DEPENDS ON THE METHOD OF SALE. As the findings of a building inspection report may prompt you to withdraw an offer, you should always ensure that you are correctly informed of your rights and options. This ...Read more
Building Inspection Reports - the ultimate negotiation weapon
Rising damp and termite damage. Two issues that would normally send shivers down your spine and see potential buyers running for the hills. But what if you could you turn a negative building inspection report, into the ultimate negotiation weapon?...Read more
What does Domestic Building Insurance means to Builder or an Owner Builder in Victoria.
Whether you are a homeowner who is using a Builder or an Owner Builder, it is mandatory to get a domestic building insurance. If you undertake domestic building work worth more than $16,000, then you need domestic building insurance. Furthermore,...Read more
Mouldy Issues For Landlords
A growing number of tenants are trying to educate landlords about the many ways in which mould can make us sick. So the ABC’s AM political reporter, Alexandra Beech, took the time to speak to one such person, Caleb Rudd. Mr Rudd is behind a Face...Read more