Call 131 546 and get a quote or book a New Home Inspection for Zilzie online today.
Jim’s Building Inspections conducts new home inspections (also known as new construction inspections) in Zilzie and the surrounding areas. Our expert consultants can assist you with every stage of your build and ensure your new build meets your expectations and the necessary standards.
Our local consultants have extensive experience and hold public liability and professional indemnity insurance—meaning you can have peace of mind when you acquire the services of a Jim’s Building Inspector.
We offer same day service for New Home Inspections in Zilzie and provide written reports via email within 24 hours of the inspection being conducted.
New Home Inspection Checklist
There are four key inspection stages which can be carried out for New Home Inspections:
1. Slab Stage
The slab stage or the base stage inspection is essential in the inspection process. Finished concrete is inspected to ensure there is an even and consistent finish. The surface should not be powdery or flakey. Levels are checked to confirm the slab has been installed within allowable deviation in the over level across and room or the entire build. The edge rebate is checked to ensure it is not “honeycombed” and there is no evidence of steel reinforcement protruding as it must have at least 40mm concrete coverage. The vapour barrier must extend past the poured concrete slab with adequate overlap left so that it extends up the side wall of the slab past the final finished ground level once the construction is completed.
2. Frame Stage
Frame stage inspections are conducted providing an independent assessment of the works to confirm they have been completed ready for stage payment. Internal checks and company appointed inspections are supported with a fresh and focussed and our review monitors the frame with respect to the approved construction methods stipulated in Australian Standard 1684.2 and the Engineers design requirements as detailed on the Approved Plans.
The installation of windows and door frames are checked at this stage. Frame positioning in relation to the supporting slab is checked with any overhanging tolerances along with load bearing timbers, lintels and orientation of Jack Studs above openings. Items such as the correct number of timber blocks and their securing method are checked along with all bracing, mechanical fasteners, tie downs and anchors.
3. Lockup
At this stage we inspect the roofing that is installed to ensure it is complete and free of defects and damage, all flashings are installed. A visual inspection is carried out to check the installation of Flashings. Brick work is checked for correct installation. All windows and doors are installed with the correct fixings using appropriate blocks and the frame straight, plumb and true.
The installed plaster to the ceilings, wall linings and fitted cornice is checked to ensure it is installed to acceptable standards. Waterproof membrane to showers & wet areas are inspected to ensure they are correctly installed and comply with the requirements of the Building Code.
4. Handover
Handover Inspections require an exhaustive check of the construction. At handover inspection we check that all the work completed “In a proper and workman like manner” ensuring that the workmanship is at an industry standard. The construction of the dwelling needs to reflect the Approved Plans and we check that all components of the building comply with relevant Australian Standards and Building Codes.
Handover or Final stage inspections are also called Practical Completion Inspections (PCI) and Pre Handover Inspections. Handover inspections are generally carried out on new homes when construction of the entire home has been completed and all internal fittings, fixtures and finishes have been installed and applied inside the home compliant with the relevant building plans and specifications.
To arrange a quote or a building inspection for a property in Zilzie, call Jim’s Building Inspections on 131 546.
Or book your Zilzie New Home Inspection service online. Reports can be delivered within 24 hours of inspection.
Blacklists For Potential Tenants? You Betcha!
Yes. Blacklisting tenants is a thing and may not be talked about because of shame-related issues. According to the ABC, a person can be blacklisted without even being aware. His or her name in such a case will pop up on tenancy databases meanin...Read more
Smoke Alarms - America's Move May Trigger Australian Action
It’s an important topic. Will moves in the United States regarding smoke alarms trigger a debate here? The dirt: As the ABC reported, new US smoke alarm laws look likely to drive ionisation alarms out of business – and an American expert has b...Read more
Due Diligence for Home Buyers
Literal meaning of Due diligence is doing a comprehensive appraisal of any buying task undertaken by a prospective buyer, especially to establish its assets and liabilities and evaluate its potential. It is utmost important to do your due diligenc...Read more
Building? Here Are Mark Campbell's Lessons Learned
“My rationale for building new was threefold,” writes Mark Campbell, a working-class Aussie. “Firstly, it enabled me to have control over the end product and it made sense from an investment perspective because I could maximise depreciation and...Read more
Timing of a building inspection
THE TIMING OF A BUILDING INSPECTION MOSTLY DEPENDS ON THE METHOD OF SALE. As the findings of a building inspection report may prompt you to withdraw an offer, you should always ensure that you are correctly informed of your rights and options. This ...Read more
Building Inspectors Break Secrets
Building inspectors break secrets. It’s their job to do so and we wouldn’t have it any other way. They’re in one very real sense property detectives. It’s fraudulent for a vendor to knowingly conceal defects according to the law. This incl...Read more
WHAT’S THE MOST COMMON BUILDING INSPECTIONS SIGNIFICANT DEFECT?
Over the past two years, the most common Significant defect found, is the damp shower. Modern showers are aesthetically pleasing and appear to be installed to the highest standard. However, countless showers have been found this year to have damp cor...Read more
Concrete stumps are not immune to decay under extreme conditions.
Many elevated properties sit on some type of stump support whether it be timber , steel , masonry or concrete . Whist most people would consider concrete stumps to be maintenance free , this is far from the truth . Recently one of our Building Inspe...Read more
Inadequate Site and subfloor drainage
A sub-floor is the structure and crawl space between the lowest floor and the ground. High moisture levels in these areas promote fungal decay and other timber pests such as termites. All sub-floors and crawl spaces should be considered as having ...Read more
Asbestos In The News
Think asbestos is old news – and not relevant in today’s society? Think again. Here’s one of many asbestos-related news stories. From the Western Advocate: WORK on Bathurst Tennis Centre’s new $800,000 clubhouse has come to a halt after...Read more