Call 131 546 and get a quote or book a New Home Inspection for Acton online today.
Jim’s Building Inspections conducts new home inspections (also known as new construction inspections) in Acton and the surrounding areas. Our expert consultants can assist you with every stage of your build and ensure your new build meets your expectations and the necessary standards.
Our local consultants have extensive experience and hold public liability and professional indemnity insurance—meaning you can have peace of mind when you acquire the services of a Jim’s Building Inspector.
We offer same day service for New Home Inspections in Acton and provide written reports via email within 24 hours of the inspection being conducted.
New Home Inspection Checklist
There are four key inspection stages which can be carried out for New Home Inspections:
1. Slab Stage
The slab stage or the base stage inspection is essential in the inspection process. Finished concrete is inspected to ensure there is an even and consistent finish. The surface should not be powdery or flakey. Levels are checked to confirm the slab has been installed within allowable deviation in the over level across and room or the entire build. The edge rebate is checked to ensure it is not “honeycombed” and there is no evidence of steel reinforcement protruding as it must have at least 40mm concrete coverage. The vapour barrier must extend past the poured concrete slab with adequate overlap left so that it extends up the side wall of the slab past the final finished ground level once the construction is completed.
2. Frame Stage
Frame stage inspections are conducted providing an independent assessment of the works to confirm they have been completed ready for stage payment. Internal checks and company appointed inspections are supported with a fresh and focussed and our review monitors the frame with respect to the approved construction methods stipulated in Australian Standard 1684.2 and the Engineers design requirements as detailed on the Approved Plans.
The installation of windows and door frames are checked at this stage. Frame positioning in relation to the supporting slab is checked with any overhanging tolerances along with load bearing timbers, lintels and orientation of Jack Studs above openings. Items such as the correct number of timber blocks and their securing method are checked along with all bracing, mechanical fasteners, tie downs and anchors.
3. Lockup
At this stage we inspect the roofing that is installed to ensure it is complete and free of defects and damage, all flashings are installed. A visual inspection is carried out to check the installation of Flashings. Brick work is checked for correct installation. All windows and doors are installed with the correct fixings using appropriate blocks and the frame straight, plumb and true.
The installed plaster to the ceilings, wall linings and fitted cornice is checked to ensure it is installed to acceptable standards. Waterproof membrane to showers & wet areas are inspected to ensure they are correctly installed and comply with the requirements of the Building Code.
4. Handover
Handover Inspections require an exhaustive check of the construction. At handover inspection we check that all the work completed “In a proper and workman like manner” ensuring that the workmanship is at an industry standard. The construction of the dwelling needs to reflect the Approved Plans and we check that all components of the building comply with relevant Australian Standards and Building Codes.
Handover or Final stage inspections are also called Practical Completion Inspections (PCI) and Pre Handover Inspections. Handover inspections are generally carried out on new homes when construction of the entire home has been completed and all internal fittings, fixtures and finishes have been installed and applied inside the home compliant with the relevant building plans and specifications.
To arrange a quote or a building inspection for a property in Acton, call Jim’s Building Inspections on 131 546.
Or book your Acton New Home Inspection service online. Reports can be delivered within 24 hours of inspection.
Tax Depreciation Schedules
Did you know Jim’s Building Inspections have now started providing Tax Depreciation Schedules for Property Investors around the country? Why? Our Inspectors are in thousands of homes and apartments everyday conducting Pre-Purchase Building Ins...Read more
Asbestos-Caused Cancer Trends Up
Asbestos-caused cancers are trending up, according to recent data from 2017. The grim facts from the Australian Institute of Health and Welfare: 710 Australians were diagnosed with mesothelioma in 2016 – a cancer caused by exposure to asbesto...Read more
What's Depreciation?
New to the property investment game and struggling with the lingo? You’re not alone. Below is one definition posted by news.com.au to build your real-estate knowledge. What’s depreciation? > Depreciation Often investors can claim a po...Read more
Common defects found in homes
Are you buying a home or investment property? Here are some of the common defects that our building inspectors in homes. Termite damage The advantages of getting a vendor report before putting your house on the market. Termite damage was found ...Read more
What's involved in a home inspection?
Most of the time we never get to meet our clients face to face and only a small handful are ever able to come along to the home inspections we organise. So there is often a bit of mystery around what exactly we do during a home inspection. ...Read more
New homes & Termite zones
An increasing number of councils across Australia are seeing the value in designating residential zones as termite prone areas in an effort to help local communities avoid costly repairs and horror surprises in the future. Victoria is the only Aus...Read more
Asbestos Dumpers Beware
There’s a right way and a wrong way to do a job and this is especially true for asbestos. As the APP reports: People and businesses that illegally transport or dump asbestos in NSW will face on-the-spot fines of up to $15,000 under tough new pen...Read more
Building Inspection Reports - the ultimate negotiation weapon
Rising damp and termite damage. Two issues that would normally send shivers down your spine and see potential buyers running for the hills. But what if you could you turn a negative building inspection report, into the ultimate negotiation weapon?...Read more
How Different Methods of Property Sale Impact When You Need a Building Inspection
THE TIMING OF A BUILDING INSPECTION DEPENDS ON YOUR SITUATION AND MOSTLY THE METHOD OF SALE. As the findings of a building inspection report may cause you to withdraw an offer you should always ensure that you are informed of your ri...Read more
Timing of a building inspection
THE TIMING OF A BUILDING INSPECTION MOSTLY DEPENDS ON THE METHOD OF SALE. As the findings of a building inspection report may prompt you to withdraw an offer, you should always ensure that you are correctly informed of your rights and options. This ...Read more