Call 131546 and get a quote or book a New Home Inspection for Point Roadknight online today.
Jim’s Building Inspections conducts new home inspections (also known as new construction inspections) in Point Roadknight and the surrounding areas. Our expert consultants can assist you with every stage of your build and ensure your new build meets your expectations and the necessary standards.
Our local consultants have extensive experience and hold public liability and professional indemnity insurance—meaning you can have peace of mind when you acquire the services of a Jim’s Building Inspector.
We offer same day service for New Home Inspections in Point Roadknight and provide written reports via email within 24 hours of the inspection being conducted.
New Home Inspection Checklist
There are four key inspection stages which can be carried out for New Home Inspections:
Slab Stage
The slab stage or the base stage inspection is essential in the inspection process. Finished concrete is inspected to ensure there is an even and consistent finish. The surface should not be powdery or flakey. Levels are checked to confirm the slab has been installed within allowable deviation in the over level across and room or the entire build. The edge rebate is checked to ensure it is not “honeycombed” and there is no evidence of steel reinforcement protruding as it must have at least 40mm concrete coverage. The vapour barrier must extend past the poured concrete slab with adequate overlap left so that it extends up the side wall of the slab past the final finished ground level once the construction is completed.
Frame Stage
Frame stage inspections are conducted providing an independent assessment of the works to confirm they have been completed ready for stage payment. Internal checks and company appointed inspections are supported with a fresh and focussed and our review monitors the frame with respect to the approved construction methods stipulated in Australian Standard 1684.2 and the Engineers design requirements as detailed on the Approved Plans.
The installation of windows and door frames are checked at this stage. Frame positioning in relation to the supporting slab is checked with any overhanging tolerances along with load bearing timbers, lintels and orientation of Jack Studs above openings. Items such as the correct number of timber blocks and their securing method are checked along with all bracing, mechanical fasteners, tie downs and anchors.
Lockup
At this stage we inspect the roofing that is installed to ensure it is complete and free of defects and damage, all flashings are installed. A visual inspection is carried out to check the installation of Flashings. Brick work is checked for correct installation. All windows and doors are installed with the correct fixings using appropriate blocks and the frame straight, plumb and true.
The installed plaster to the ceilings, wall linings and fitted cornice is checked to ensure it is installed to acceptable standards. Waterproof membrane to showers & wet areas are inspected to ensure they are correctly installed and comply with the requirements of the Building Code.
Handover
Handover Inspections require an exhaustive check of the construction. At handover inspection we check that all the work completed “In a proper and workman like manner” ensuring that the workmanship is at an industry standard. The construction of the dwelling needs to reflect the Approved Plans and we check that all components of the building comply with relevant Australian Standards and Building Codes.
Handover or Final stage inspections are also called Practical Completion Inspections (PCI) and Pre Handover Inspections. Handover inspections are generally carried out on new homes when construction of the entire home has been completed and all internal fittings, fixtures and finishes have been installed and applied inside the home compliant with the relevant building plans and specifications.
To arrange a quote or a building inspection for a property in Point Roadknight, call Jim’s Building Inspections on 131546.
Or book your Point Roadknight New Home Inspection service online. Reports can be delivered within 24 hours of inspection.
Proposed New Tax To Help Home Owners Remove Asbestos
Did you know that 1 in 3 Australian homes contain asbestos? With home renovations on the rise, many Australian's are purchasing homes built before 1985 with the intention of doing small renos through to complete rebuilds. Unfortunately, many people a...Read more
Asbestos Concerns? Call The Experts
Here’s an all too familiar story from the Newcastle Herald: A Glendale property is demolished after its owners found deadly loose-fill asbestos insulation. This type of asbestos was relatively popular in the1960s and 1970s. Science now tells ...Read more
Depreciation - A Most Valuable Deduction
Looking to claim? For property owners, depreciation is the gift that keeps on giving and another reason to talk with the professionals at Jim’s Building Inspections. To wit, investors deduct the amount of income-producing assets in decline over the...Read more
What is a Building Inspection?
A building inspection is designed to give you independent and objective advice about the physical state of a building, enabling you to make an informed decision, generally about whether or not to buy a building. A building inspection is a snapshot...Read more
WHAT’S THE MOST COMMON BUILDING INSPECTIONS SIGNIFICANT DEFECT?
Over the past two years, the most common Significant defect found, is the damp shower. Modern showers are aesthetically pleasing and appear to be installed to the highest standard. However, countless showers have been found this year to have damp cor...Read more
Property Depreciation - Some Questions
Q: What’s property depreciation all about? A: In a nutshell, depreciation is a tax deduction when your property’s value declines. The result: Less tax, more money in your pocket. Q: Where can I find professional help? A: Jim’s Buildi...Read more
Building Inspection Reports - the ultimate negotiation weapon
Rising damp and termite damage. Two issues that would normally send shivers down your spine and see potential buyers running for the hills. But what if you could you turn a negative building inspection report, into the ultimate negotiation weapon?...Read more
How Different Methods of Property Sale Impact When You Need a Building Inspection
THE TIMING OF A BUILDING INSPECTION DEPENDS ON YOUR SITUATION AND MOSTLY THE METHOD OF SALE. As the findings of a building inspection report may cause you to withdraw an offer you should always ensure that you are informed of your ri...Read more
Meth testing - the new norm for prudent home buyers
The New Norm? Including Meth checks in Pre-Purchase Building Inspections For home buyers there is nothing unusual about organising a Pre-Purchase Building Inspection on a potential property purchase. For smart buyers, a Pre-Purchase Building Inspe...Read more
Inadequate Site and subfloor drainage
A sub-floor is the structure and crawl space between the lowest floor and the ground. High moisture levels in these areas promote fungal decay and other timber pests such as termites. All sub-floors and crawl spaces should be considered as having ...Read more