Call 131546 and get a quote or book a New Home Inspection for Quinninup online today.
Jim’s Building Inspections conducts new home inspections (also known as new construction inspections) in Quinninup and the surrounding areas. Our expert consultants can assist you with every stage of your build and ensure your new build meets your expectations and the necessary standards.
Our local consultants have extensive experience and hold public liability and professional indemnity insurance—meaning you can have peace of mind when you acquire the services of a Jim’s Building Inspector.
We offer same day service for New Home Inspections in Quinninup and provide written reports via email within 24 hours of the inspection being conducted.
New Home Inspection Checklist
There are four key inspection stages which can be carried out for New Home Inspections:
Slab Stage
The slab stage or the base stage inspection is essential in the inspection process. Finished concrete is inspected to ensure there is an even and consistent finish. The surface should not be powdery or flakey. Levels are checked to confirm the slab has been installed within allowable deviation in the over level across and room or the entire build. The edge rebate is checked to ensure it is not “honeycombed” and there is no evidence of steel reinforcement protruding as it must have at least 40mm concrete coverage. The vapour barrier must extend past the poured concrete slab with adequate overlap left so that it extends up the side wall of the slab past the final finished ground level once the construction is completed.
Frame Stage
Frame stage inspections are conducted providing an independent assessment of the works to confirm they have been completed ready for stage payment. Internal checks and company appointed inspections are supported with a fresh and focussed and our review monitors the frame with respect to the approved construction methods stipulated in Australian Standard 1684.2 and the Engineers design requirements as detailed on the Approved Plans.
The installation of windows and door frames are checked at this stage. Frame positioning in relation to the supporting slab is checked with any overhanging tolerances along with load bearing timbers, lintels and orientation of Jack Studs above openings. Items such as the correct number of timber blocks and their securing method are checked along with all bracing, mechanical fasteners, tie downs and anchors.
Lockup
At this stage we inspect the roofing that is installed to ensure it is complete and free of defects and damage, all flashings are installed. A visual inspection is carried out to check the installation of Flashings. Brick work is checked for correct installation. All windows and doors are installed with the correct fixings using appropriate blocks and the frame straight, plumb and true.
The installed plaster to the ceilings, wall linings and fitted cornice is checked to ensure it is installed to acceptable standards. Waterproof membrane to showers & wet areas are inspected to ensure they are correctly installed and comply with the requirements of the Building Code.
Handover
Handover Inspections require an exhaustive check of the construction. At handover inspection we check that all the work completed “In a proper and workman like manner” ensuring that the workmanship is at an industry standard. The construction of the dwelling needs to reflect the Approved Plans and we check that all components of the building comply with relevant Australian Standards and Building Codes.
Handover or Final stage inspections are also called Practical Completion Inspections (PCI) and Pre Handover Inspections. Handover inspections are generally carried out on new homes when construction of the entire home has been completed and all internal fittings, fixtures and finishes have been installed and applied inside the home compliant with the relevant building plans and specifications.
To arrange a quote or a building inspection for a property in Quinninup, call Jim’s Building Inspections on 131546.
Or book your Quinninup New Home Inspection service online. Reports can be delivered within 24 hours of inspection.
The Politics Of Smoke Alarms
From 1993 to 2015, CSIRO conducted tests on smoke alarms but the public is yet to read the findings. This comes at a time when activists want ionised smoke alarms banned due to alleged issues with response times to common fires. In America, the alarm...Read more
The Block's Depreciation Schedules And You
So, “investors could claim an average of over $2.2 million in depreciation deductions for each apartment on Channel 9’s 2016 season of The Block,” according to new analysis reported by The Urban Developer. By far the biggest potential deprec...Read more
Things to consider when building your first home
You might decide that rather than buying an established property as your first home, it would better suit you to build. Building your first home can be both an exciting and overwhelming experience. Building allows you to customise your home from t...Read more
Blacklists For Potential Tenants? You Betcha!
Yes. Blacklisting tenants is a thing and may not be talked about because of shame-related issues. According to the ABC, a person can be blacklisted without even being aware. His or her name in such a case will pop up on tenancy databases meanin...Read more
Tax Depreciation Schedules
Did you know Jim’s Building Inspections have now started providing Tax Depreciation Schedules for Property Investors around the country? Why? Our Inspectors are in thousands of homes and apartments everyday conducting Pre-Purchase Building Ins...Read more
Two Things You Need To Know About Smoke Alarms
One: Smoke Alarms Aren’t Always Reliable Smoke alarms aren’t always reliable which is why a professional inspector can make your job easier and life safer. A good inspection takes into account adequate positioning and operational status in orde...Read more
Property Styling - the Melbourne stats
Property Styling, Melbourne, works. If you were considering property styling in Melbourne as part of your sale campaign, you can now rest easy knowing that every dollar invested in property styling is likely to return over $1900 to your back pocket ...Read more
Timing of a building inspection
THE TIMING OF A BUILDING INSPECTION MOSTLY DEPENDS ON THE METHOD OF SALE. As the findings of a building inspection report may prompt you to withdraw an offer, you should always ensure that you are correctly informed of your rights and options. This ...Read more
Rental Reforms To Hit Queensland
Queensland’s 40-year-old rental laws are under scrutiny. One big potential change: making it easier for tenants to own pets and more pressure to address repairs in a timely manner. Property owners, however, may have more powers in their hands to ch...Read more
Blocked Guttering- One of the most Common Pre-Purchase Defects
Blocked gutters are one of the main defects found during a pre purchase inspection and is also one of the easiest to fix and prevent. Doing something as simple as keeping your gutters clean can save you thousands of dollars in maintenance costs in th...Read more