Call 131546 and get a quote or book a New Home Inspection for Carrabin online today.
Jim’s Building Inspections conducts new home inspections (also known as new construction inspections) in Carrabin and the surrounding areas. Our expert consultants can assist you with every stage of your build and ensure your new build meets your expectations and the necessary standards.
Our local consultants have extensive experience and hold public liability and professional indemnity insurance—meaning you can have peace of mind when you acquire the services of a Jim’s Building Inspector.
We offer same day service for New Home Inspections in Carrabin and provide written reports via email within 24 hours of the inspection being conducted.
New Home Inspection Checklist
There are four key inspection stages which can be carried out for New Home Inspections:
Slab Stage
The slab stage or the base stage inspection is essential in the inspection process. Finished concrete is inspected to ensure there is an even and consistent finish. The surface should not be powdery or flakey. Levels are checked to confirm the slab has been installed within allowable deviation in the over level across and room or the entire build. The edge rebate is checked to ensure it is not “honeycombed” and there is no evidence of steel reinforcement protruding as it must have at least 40mm concrete coverage. The vapour barrier must extend past the poured concrete slab with adequate overlap left so that it extends up the side wall of the slab past the final finished ground level once the construction is completed.
Frame Stage
Frame stage inspections are conducted providing an independent assessment of the works to confirm they have been completed ready for stage payment. Internal checks and company appointed inspections are supported with a fresh and focussed and our review monitors the frame with respect to the approved construction methods stipulated in Australian Standard 1684.2 and the Engineers design requirements as detailed on the Approved Plans.
The installation of windows and door frames are checked at this stage. Frame positioning in relation to the supporting slab is checked with any overhanging tolerances along with load bearing timbers, lintels and orientation of Jack Studs above openings. Items such as the correct number of timber blocks and their securing method are checked along with all bracing, mechanical fasteners, tie downs and anchors.
Lockup
At this stage we inspect the roofing that is installed to ensure it is complete and free of defects and damage, all flashings are installed. A visual inspection is carried out to check the installation of Flashings. Brick work is checked for correct installation. All windows and doors are installed with the correct fixings using appropriate blocks and the frame straight, plumb and true.
The installed plaster to the ceilings, wall linings and fitted cornice is checked to ensure it is installed to acceptable standards. Waterproof membrane to showers & wet areas are inspected to ensure they are correctly installed and comply with the requirements of the Building Code.
Handover
Handover Inspections require an exhaustive check of the construction. At handover inspection we check that all the work completed “In a proper and workman like manner” ensuring that the workmanship is at an industry standard. The construction of the dwelling needs to reflect the Approved Plans and we check that all components of the building comply with relevant Australian Standards and Building Codes.
Handover or Final stage inspections are also called Practical Completion Inspections (PCI) and Pre Handover Inspections. Handover inspections are generally carried out on new homes when construction of the entire home has been completed and all internal fittings, fixtures and finishes have been installed and applied inside the home compliant with the relevant building plans and specifications.
To arrange a quote or a building inspection for a property in Carrabin, call Jim’s Building Inspections on 131546.
Or book your Carrabin New Home Inspection service online. Reports can be delivered within 24 hours of inspection.
Property Styling - the Melbourne stats
Property Styling, Melbourne, works. If you were considering property styling in Melbourne as part of your sale campaign, you can now rest easy knowing that every dollar invested in property styling is likely to return over $1900 to your back pocket ...Read more
The Pitfalls Of Property Investment
The pitfalls of property investment are many. Andrew Heaton from Sourceable advances the argument that it’s important to get a quality survey. While a retail store is often happy to return a $10 item of clothing, it’s far more complex with rea...Read more
What Victoria’s New Tenancy Laws Mean For Landlords
Victoria’s new tenancy laws mean that landlords need to pay extra attention to basic standards, especially relating to health and safety. These include (but are not limited to) providing functioning heaters, stoves and even deadlocks. Furthermore, ...Read more
How Different Methods of Property Sale Impact When You Need a Building Inspection
THE TIMING OF A BUILDING INSPECTION DEPENDS ON YOUR SITUATION AND MOSTLY THE METHOD OF SALE. As the findings of a building inspection report may cause you to withdraw an offer you should always ensure that you are informed of your ri...Read more
Two Things You Need To Know About Smoke Alarms
One: Smoke Alarms Aren’t Always Reliable Smoke alarms aren’t always reliable which is why a professional inspector can make your job easier and life safer. A good inspection takes into account adequate positioning and operational status in orde...Read more
Tax Depreciation Schedules
Did you know Jim’s Building Inspections have now started providing Tax Depreciation Schedules for Property Investors around the country? Why? Our Inspectors are in thousands of homes and apartments everyday conducting Pre-Purchase Building Ins...Read more
Asbestos Imports - A Health Concern
If you follow the news, you’ll be aware that Chinese companies have been exporting asbestos products to Australia. But did you know that they’re not alone? There’s a long list of countries exporting products with asbestos to Australia. They ...Read more
Inadequate Site and subfloor drainage
A sub-floor is the structure and crawl space between the lowest floor and the ground. High moisture levels in these areas promote fungal decay and other timber pests such as termites. All sub-floors and crawl spaces should be considered as having ...Read more
The Block's Depreciation Schedules And You
So, “investors could claim an average of over $2.2 million in depreciation deductions for each apartment on Channel 9’s 2016 season of The Block,” according to new analysis reported by The Urban Developer. By far the biggest potential deprec...Read more
How is a House Inspection Organised?
Whilst it’s up to you, the majority of our clients simply provide the Real Estate Agents details and then we will then contact them to organise the date and time of the house inspection. Generally this saves you a few more phone calls and emails...Read more