Call 131546 and get a quote or book a New Home Inspection for Splitters Creek online today.

Jim’s Building Inspections conducts new home inspections (also known as new construction inspections) in Splitters Creek and the surrounding areas. Our expert consultants can assist you with every stage of your build and ensure your new build meets your expectations and the necessary standards.

Our local consultants have extensive experience and hold public liability and professional indemnity insurance—meaning you can have peace of mind when you acquire the services of a Jim’s Building Inspector.

We offer same day service for New Home Inspections in Splitters Creek and provide written reports via email within 24 hours of the inspection being conducted.

 

New Home Inspection Checklist

There are four key inspection stages which can be carried out for New Home Inspections:


Slab Stage

The slab stage or the base stage inspection is essential in the inspection process. Finished concrete is inspected to ensure there is an even and consistent finish. The surface should not be powdery or flakey. Levels are checked to confirm the slab has been installed within allowable deviation in the over level across and room or the entire build. The edge rebate is checked to ensure it is not “honeycombed” and there is no evidence of steel reinforcement protruding as it must have at least 40mm concrete coverage. The vapour barrier must extend past the poured concrete slab with adequate overlap left so that it extends up the side wall of the slab past the final finished ground level once the construction is completed.

 

Frame Stage

Frame stage inspections are conducted providing an independent assessment of the works to confirm they have been completed ready for stage payment. Internal checks and company appointed inspections are supported with a fresh and focussed and our review monitors the frame with respect to the approved construction methods stipulated in Australian Standard 1684.2 and the Engineers design requirements as detailed on the Approved Plans.

The installation of windows and door frames are checked at this stage. Frame positioning in relation to the supporting slab is checked with any overhanging tolerances along with load bearing timbers, lintels and orientation of Jack Studs above openings. Items such as the correct number of timber blocks and their securing method are checked along with all bracing, mechanical fasteners, tie downs and anchors.

 

Lockup

At this stage we inspect the roofing that is installed to ensure it is complete and free of defects and damage, all flashings are installed. A visual inspection is carried out to check the installation of Flashings. Brick work is checked for correct installation. All windows and doors are installed with the correct fixings using appropriate blocks and the frame straight, plumb and true.

The installed plaster to the ceilings, wall linings and fitted cornice is checked to ensure it is installed to acceptable standards. Waterproof membrane to showers & wet areas are inspected to ensure they are correctly installed and comply with the requirements of the Building Code.

 

Handover

Handover Inspections require an exhaustive check of the construction. At handover inspection we check that all the work completed “In a proper and workman like manner” ensuring that the workmanship is at an industry standard. The construction of the dwelling needs to reflect the Approved Plans and we check that all components of the building comply with relevant Australian Standards and Building Codes.

Handover or Final stage inspections are also called Practical Completion Inspections (PCI) and Pre Handover Inspections. Handover inspections are generally carried out on new homes when construction of the entire home has been completed and all internal fittings, fixtures and finishes have been installed and applied inside the home compliant with the relevant building plans and specifications.

 

To arrange a quote or a building inspection for a property in Splitters Creek, call Jim’s Building Inspections on 131546.
Or book your Splitters Creek New Home Inspection service online. Reports can be delivered within 24 hours of inspection.

How To Avoid Renovation Traps

Renovations done right can pay off. Literally. That said there are some serious traps to avoid. Potential problems from wiring to asbestos issues often come up especially in older houses, so it’s important to seek professional help. Jim’s Buil...
Read more

Safety Reversal Check For Automatic Garage Door

In most houses, the largest moving object is a garage door. Newer garage doors are often operated remotely through radio controls, electrical systems, pulleys and motors. Serious injury or death from being hit by a closing garage door or from bein...
Read more

Need To Know - Building Inspection Inclusions and Exclusions

It is important to understand what is generally included and excluded in a building inspection service.  Jim's Building Inspections work hard to understand what type of property you are purchasing. Factors that influence which building inspection...
Read more

Tax Depreciation Schedules

Did you know Jim’s Building Inspections have now started providing Tax Depreciation Schedules for Property Investors around the country?  Why? Our Inspectors are in thousands of homes and apartments everyday conducting Pre-Purchase Building Ins...
Read more

What Does Jim Know About Building Inspections Anyway?

ACTUALLY, QUITE A BIT MORE THAN WE EVER REALISED! We recently discovered that Jim Penman’s dad was a forensic engineer. From an early age Jim’s father was investigating materials, structures and their components which failed o...
Read more

How Jim's Building Inspections Became Australia's Number One Choice

Jim’s Building Inspections has grown to become Australia’s largest building inspection business in just three years. How did we do that? It was actually pretty easy, which is probably a damning commentary on the state of the industry! The ...
Read more

Concrete stumps are not immune to decay under extreme conditions.

Many elevated properties sit on some type of stump support whether it be timber , steel , masonry or concrete . Whist most people would consider concrete stumps to be maintenance free , this is far from the truth . Recently one of our Building Inspe...
Read more

What Victoria’s New Tenancy Laws Mean For Landlords

Victoria’s new tenancy laws mean that landlords need to pay extra attention to basic standards, especially relating to health and safety. These include (but are not limited to) providing functioning heaters, stoves and even deadlocks. Furthermore, ...
Read more

How Can I Save Money This Year?

This year has been a year of challenges. These challenging times are leading to many investors asking the question how can I save money this year? One of the ways many investors can save money is by looking for ways to reduce their tax burden. That ...
Read more

Am I An Owner Builder?

Whether you are or aren’t an owner builder can sometimes be a tricky concept to get your head around. Even if you didn’t personally lift a hammer, but rather project managed different trades to do the work, – you are still, legally, the owne...
Read more


In Splitters Creek

qld Suburbs Index

New Home Inspections suburbs in moore-park region